CFOS for QuickBooks, coming January 2027See what you get
CFOSLANDSCAPING
CFOS FOR QUICKBOOKS · LANDSCAPING

Job costing software for landscaping contractors

Commercial landscaping bills an install, then a warranty and maintenance period. CFOS for QuickBooks costs plants, crews, watering and replacements to the job. A job that looks finished can't keep spending without you seeing it.

Every Monday we email the list what we built that week, with screenshots or a short video, and we email you the day it opens. Your address stays with Run On CFOS. One click unsubscribes.

Early access offer: everyone on this list before CFOS for QuickBooks opens gets 12 months with no subscription fee, counted from the day it opens in January 2027. During those 12 months the only charge is AI use, billed every Monday at what it costs us plus 10 percent for the work of billing it. Pay by bank transfer (ACH) and that is the whole charge, and pay by card and 3 percent is added for the card fee. After the 12 months the regular monthly price for your size starts, and you can cancel anytime before then with nothing owed but the AI you used.

30 days free, a 90-day money-back guarantee, and cancel anytime. It opens January 2027. We email you every Monday with what we built, and the day it opens.

How landscaping bills and where the money leaks

Commercial landscape install usually bills on a schedule of values with a monthly pay app and retainage. Lines follow the scope: soil and fine grading, trees, shrubs, sod or seed, mulch and edging, and hardscape when it's in your contract. Maintenance is a separate contract or a recurring line billed monthly, with enhancements like seasonal color priced as extras.

The leak is that install bills early and the warranty spends late. Trees and shrubs that die in the warranty period are replaced at your cost, and watering the job until acceptance is often on you too. Retainage commonly waits until the owner accepts the work or the warranty ends, so the last check can come a season or more after the crew left.

Material and timing are the other soft spots. The nursery substitutes a size or a variety, topsoil import comes in over the quantity you bid, and the GC pushes planting into hot weather that needs more water and more replacements. Other trades park and drive on finished sod and beds, and without a signed T&M ticket you repair them at your own cost.

How landscaping costs split and what CFOS tracks

A landscape job spends on plant material, soil and amendments, mulch and stone, crew labor, equipment like skid steers and trucks, water and watering trips, and subs for tree spade work or hardscape. Plant material and labor are the two big numbers. The watering and warranty costs are small per trip and large over a season.

CFOS reads your jobs, cost codes and vendors from QuickBooks Online and compares actual cost to the estimate by cost code, updated every hour. Nursery invoices and soil tickets emailed to your bills inbox are read, coded to the job and checked against the PO. A substitution or an overage on the bill is easy to spot against the order.

If you set up install, watering, warranty replacement and maintenance as separate cost codes, each one has its own budget and actual. Skid steers, trucks and water trailers get an equipment daily rate charged to the job on each day they're on a daily. You see whether the warranty you priced matches what you're spending.

Workflow from the field to the office

The crew lead fills out a daily with the crew, the equipment and photos of what was planted. Field time is approved and goes to QuickBooks Payroll, coded to install, watering or maintenance. A watering trip is a short visit, and the daily keeps it on the right job.

When the GC adds a planting bed, swaps a species after approval or asks you to redo sod another trade damaged, a T&M ticket goes on the daily. The GC signs it on site and it becomes a change order draft for the next pay app. Photos from before and after the damage go with the ticket.

The PM builds the install pay app from the schedule of values, and maintenance can be set up as recurring lines. CFOS lays out the G702 and G703 with retainage tracked on each line. Pay app due dates send reminders to the PM, so a small monthly maintenance bill doesn't get forgotten.

What the owner sees every month

Each month the PM enters cost to complete on each job, including the watering and warranty still to come, and you approve it. The WIP schedule shows over and under billing by job. A job that billed its last install line in spring still counts the replacements due before the warranty walk.

The CEO Report grades your gross margin, overhead and net profit before taxes against the published average for landscaping and the CFOS target for your size. It tells you if your plant markup and crew rates cover the whole job, warranty included. The 13 week cash forecast reads your QuickBooks and pay apps and marks the lowest week, which helps in spring when nursery bills come due before the first pay app is paid.

AR aging and a collections list keep retainage held for the warranty from being forgotten. You can ask Claude or ChatGPT about your own jobs, like how much last year's warranty replacements cost. It reads your numbers and can't change them.

COST CODES

Landscaping cost codes, matched to QuickBooks

Each group below is one set of cost codes in CFOS. Bills, time and equipment post to them. QuickBooks keeps the books underneath, so your bookkeeper sees the same numbers.

Cost code groupWhat goes on it
Soil and fine gradingTopsoil import, amendments, fine grading and bed prep.
TreesTrees by caliper, staking and guying, tree spade or crane time, and planting labor.
Shrubs and perennialsShrubs, grasses, perennials and annuals by container size, with planting labor.
Sod and seedSod by the square foot or pallet, hydroseed, seed, erosion blanket and the labor to install it.
Mulch, stone and edgingMulch, decorative rock, steel or plastic edging and weed barrier.
HardscapePavers, walls, steps and base when they're in your scope, or the sub who builds them.
Watering until acceptanceWater truck or trailer trips, water cost and labor to keep plants alive before the owner accepts the job.
Warranty replacementDead plants replaced within the warranty period, the material and the trip.
MaintenanceMowing, pruning, cleanups and seasonal visits billed on a maintenance contract.
Damage repair and extrasSod and beds repaired after other trades, tied to a signed T&M ticket and change order.
THE NUMBERS FOR LANDSCAPING

How landscaping contractors do, by revenue

Each row shows the all-trade average, this trade's average and the CFOS target. These are the numbers your own job costing gets graded against. Net profit is before taxes in every row.

RevenueOverheadGross marginNet profit, before taxes
$1M to $5M15.1% all-trade average
15% Landscaping
14.1% CFOS target
22.1% all-trade average
22% Landscaping
25% CFOS target
7% all-trade average
7% Landscaping
11% CFOS target
$5M to $10M14.1% all-trade average
14% Landscaping
13.1% CFOS target
23.4% all-trade average
23% Landscaping
26% CFOS target
9.4% all-trade average
9% Landscaping
12.9% CFOS target
$10M to $25M13.1% all-trade average
13% Landscaping
12.1% CFOS target
24.6% all-trade average
24% Landscaping
27.1% CFOS target
11.5% all-trade average
11% Landscaping
15% CFOS target
$25M to $50M12.1% all-trade average
12% Landscaping
11.1% CFOS target
25.7% all-trade average
25% Landscaping
28.2% CFOS target
13.7% all-trade average
13% Landscaping
17.2% CFOS target
HOW THE NET PROFIT FIGURES ARE BUILT.

Gross margin and overhead come from figures CFMA, Jones Maresca and other sources publish by trade and size. Net profit is computed, not surveyed: net profit = gross margin minus overhead. Nothing comes out for taxes, interest or other income and expense, so it is a before tax figure, on the same basis as CFMA's net income before taxes.

CFMA's 2025 medians are 7.1 percent before interest and taxes and 6.7 percent net income before taxes. Gross margin minus overhead leaves out interest and other income and expense, so a figure here can come in a little above or below a reported net income on the same business.

Above the $10M to $25M band the gross margin and overhead rows are a modeled extension of the same curves. They have not been reconciled against the licensed CFMA Benchmarker, so read those bands as a model and not as a survey result.

See every figure for landscaping.

90-DAY MONEY-BACK · CANCEL ANYTIME

Get on the list for the day it opens

30 days free, a 90-day money-back guarantee, and cancel anytime.

Every Monday we email the list what we built that week, with screenshots or a short video, and we email you the day it opens. Your address stays with Run On CFOS. One click unsubscribes.

Early access offer: everyone on this list before CFOS for QuickBooks opens gets 12 months with no subscription fee, counted from the day it opens in January 2027. During those 12 months the only charge is AI use, billed every Monday at what it costs us plus 10 percent for the work of billing it. Pay by bank transfer (ACH) and that is the whole charge, and pay by card and 3 percent is added for the card fee. After the 12 months the regular monthly price for your size starts, and you can cancel anytime before then with nothing owed but the AI you used.

30 days free, a 90-day money-back guarantee, and cancel anytime. It opens January 2027. We email you every Monday with what we built, and the day it opens.

QUESTIONS

What landscaping contractors ask

How do I track warranty replacements on a job that's already billed?

Set up warranty replacement as its own cost code on the job. Bills and crew time keep posting to it after the last pay app, and the monthly cost to complete counts what's left. The WIP schedule keeps the job open until the warranty is done.

Can I bill install and monthly maintenance on the same contract?

Yes. Set up the schedule of values with the install lines and maintenance as recurring lines. CFOS builds the pay app each period and tracks retainage on each one.

What about watering before the owner accepts the job?

Code watering trips to their own cost code, with the crew and truck on the daily. You see what watering cost against what you priced. If the GC delayed acceptance, a signed T&M ticket turns the extra trips into a change order draft.

How do I check nursery bills against what was ordered?

Email nursery invoices to your bills inbox. CFOS reads them, codes them to the job and checks them against the PO, so a substitution or a higher price is caught before it's paid. You decide whether to accept it or ask for a credit.

Does CFOS replace QuickBooks Online for my landscaping company?

No. QuickBooks Online keeps your books, and CFOS works on top of it. It reads and writes jobs, cost codes, vendors, bills and invoices, so there's no migration.

Updated

8 Steps 60 Days

CONTROL is the full system, written for commercial subcontractors from $1M to $100M. It's out now. 8 steps, 6 working templates, and the order they install in. $9.99 ebook, $24.99 paperback.