SYSTEM HUB
The system,
step by step
8 steps in sequence. Each one depends on what came before it and changes what comes after.
THE 8 STEPS
In order
CFOS-01 · CHAPTER 1
Job cost structure
Seven cost categories and three levels of granularity, built so the estimate and the ledger use the same words.
CFOS-02 · CHAPTER 2
Equipment cost basis
A correct internal rate per machine covering ownership, maintenance, fuel, and transport, charged to the projects that used it.
CFOS-03 · CHAPTER 3
Overhead calculation
What indirect cost really comes to at your size, and the rate your estimating template should be using.
CFOS-04 · CHAPTER 4
Estimating system
The estimate maps one to one onto the job cost codes, so variance means something the day it appears.
CFOS-05 · CHAPTER 5
Software and bookkeeping alignment
Live job costs inside thirty seconds, with the bookkeeping cadence that keeps them current.
CFOS-06 · CHAPTER 6
Project management
Billing dates, change orders, and notices, written as standards that work without anyone following up on them.
CFOS-07 · CHAPTER 7
Monthly cadence
Weekly bookkeeping, cost to complete, and one CEO report, on the same days every month.
CFOS-08 · CHAPTER 8
Standards and accountability
Five hours a month of owner time, spent projecting the work.
BENCHMARKS
The published figures
CFOS-03
Overhead
What your trade reports at your size, what the CFOS target is, and why the number on your bid sheet doesn't match either one.
CFOS-01
Gross margin
What your trade earns above direct cost at your size, and the margin the system is meant to maintain as a minimum.
CFOS-07
Net profit
What is left after all expenses, by trade and by size, and the number the system is built to reach.
Most contractors don't have a money problem. They have a visibility problem. Josh has built the rare book that fixes it the right way: not with a pep talk, but with a system. Eight steps, one monthly cadence, and a set of numbers you can actually hold your business to. Every chapter earns its place with a real contractor and a real result. If you want control and clarity over where your money goes, read this and then do what it says. The process works. Whether you show up for it is the only variable left.
AUTHOR