CFOS-01GROSS MARGIN
BENCHMARK · 48 TRADES · 7 REVENUE BANDS

Gross margin by trade and revenue band

What your trade earns above direct cost at your size, and the margin the system is meant to maintain as a minimum.

THE FULL REFERENCE

Run On CFOS publishes the full benchmark reference: 48 trades across all 7 revenue bands, $1M to $500M and above. The 4 bands above $25M are modeled and labeled that way in every table. Each CFOS net profit target is set per trade and band: the higher of 10% and the trade's net profit average plus 3.5 points before taxes, and the book's 12% is the rule of thumb, not every trade's target. Run On CFOS computes net profit as gross margin minus overhead, before taxes.

DIRECT ANSWER

Gross margin for commercial subcontractors goes from 18% to 27% of revenue in the $1M to $5M band across 48 published trades. The CFOS target recalculates at your revenue: the net profit target plus the overhead target, so the three targets tie.

YOUR REVENUE
$2,000,000
$
Every percentage below reads out in dollars, and the band follows your number. Click any trade to see just that one.
48 of 48 trades

Inside the range the published surveys report.

GROSS MARGIN AS A PERCENTAGE OF REVENUE · 48 TRADES · SPM TRADE BENCHMARK REFERENCE
Trade$1M to $5M$5M to $10M$10M to $25M$25M to $50MModeled$50M to $100MModeled$100M to $500MModeled$500M+ModeledCFOS target $1M to $5M
Civil and earthwork11 trades
21%23%25%26%27%28%30%23.5%
20%22%23%25%26%28%29%25%
21%23%24%26%27%28%30%23.5%
18%20%22%23%25%27%28%25%
20%22%23%25%26%28%29%23%
23%24%26%27%28%30%31%25.5%
18%20%22%24%26%27%28%24%
24%26%27%29%30%32%34%26.5%
18%20%22%23%25%27%28%24%
22%23%24%25%27%28%30%24.5%
23%24%25%26%28%29%31%25.5%
Concrete and masonry5 trades
21%22%23%24%25%26%28%23.5%
22%23%24%25%26%27%29%24.5%
21%22%23%24%25%26%28%23.5%
22%23%24%25%26%27%29%24.5%
23%24%25%26%28%29%31%25.5%
Landscape and irrigation2 trades
22%23%24%25%26%27%29%24.5%
22%23%24%25%26%27%29%24.5%
Electrical and technology6 trades
25%27%28%29%30%32%33%27.5%
22%23%24%25%27%28%30%24.5%
24%25%26%27%29%30%32%26.5%
22%24%25%26%28%29%31%25%
22%23%24%25%27%28%30%24.5%
22%23%24%25%26%28%29%24.5%
Mechanical and life safety7 trades
24%25%26%27%29%30%32%26.5%
25%26%27%28%30%31%33%27.5%
25%26%27%28%30%31%33%27.5%
24%25%26%27%29%30%32%26.5%
24%25%26%27%29%30%32%26.5%
23%25%26%27%28%30%31%25.5%
27%28%29%30%32%33%35%29.5%
Envelope and structure8 trades
27%28%29%30%31%32%34%29.5%
23%24%25%26%27%28%30%25.5%
18%19%20%22%23%25%27%22%
22%23%24%25%26%28%29%24.5%
22%23%24%25%27%28%30%24.5%
21%22%23%24%25%26%28%23.5%
23%24%25%26%28%29%31%25.5%
26%27%28%29%31%32%34%28.5%
Interiors and finishes6 trades
21%22%23%24%26%27%29%23.5%
19%21%22%23%25%27%28%22%
19%21%22%23%25%26%28%23%
19%21%22%23%25%26%28%22%
18%20%21%22%24%25%27%22%
22%23%24%25%26%28%29%24.5%
Specialty3 trades
22%23%25%26%27%28%30%24.5%
23%24%25%27%28%30%32%25.5%
26%28%29%31%32%34%36%28.5%

Target. The CFOS target recalculates at your revenue: the net profit target plus the overhead target, so the three targets tie. Gross margin target minus overhead target is the net profit target on all 48 of 48 published trades. It is published at all 7 bands. The 4 bands above $10M to $25M are a modeled extension of the averages; the target there follows the same rule.

HOW THE NET PROFIT FIGURES ARE BUILT.

Gross margin and overhead come from figures CFMA, Jones Maresca and other sources publish by trade and size. Net profit is computed, not surveyed: net profit = gross margin minus overhead. Nothing comes out for taxes, interest or other income and expense, so it is a before tax figure, on the same basis as CFMA's net income before taxes.

CFMA's 2025 medians are 7.1 percent before interest and taxes and 6.7 percent net income before taxes. Gross margin minus overhead leaves out interest and other income and expense, so a figure here can come in a little above or below a reported net income on the same business.

Above the $10M to $25M band the gross margin and overhead rows are a modeled extension of the same curves. They have not been reconciled against the licensed CFMA Benchmarker, so read those bands as a model and not as a survey result.

CIVIL AT $1M to $5M
21%
INDUSTRY AVERAGE at the selected revenue band.
CFOS TARGET
23.5%
What the system is built to hold.
THE GAP
2.5%
Between the industry average and the CFOS target.
THE FULL TABLE

What your trade has

All 48 published trades across all 7 revenue bands. Pick your trade and revenue above and the table follows.

CITE THIS

Run On CFOS. Run On CFOS Trade Benchmark Reference: Gross margin. 2026. Sulphur Prairie Operations, LLC. https://runoncfos.com/benchmarks/gross-margin. CC BY 4.0.

Figures on this page were last revised 2026-08-21. Published under CC BY 4.0, which permits reuse of any figure here, including commercially, as long as the credit above travels with it. The same figures in machine-readable form: /benchmarks.json.

Trade level gross margin and overhead come from figures CFMA, Jones Maresca and other sources publish, and Run On CFOS computes net profit from them: net profit = gross margin minus overhead, before taxes. The CFOS targets beside them are from the book CONTROL: C.F.O.S. Construction Financial Operating System, published with the full reference at runoncfos.com.

SOURCES
  1. 2024 Construction Financial Benchmarker, Executive Summary, Construction Financial Management Association, 2024.
  2. 2025 Construction Financial Benchmarker, Executive Summary, Construction Financial Management Association, 2025.
  3. 2025 Performance Benchmarks, Construction Companies, Jones Maresca and Company, 2025.
  4. Run On CFOS Trade Benchmark Reference, Sulphur Prairie Operations, LLC, 2026.

Sourcing and method: the methodology page.

Which bands are measured. The 4 bands above $10M to $25M extend the survey curve further out and have not been reconciled against the licensed CFMA Benchmarker. How every figure was built is explained on the methodology page.

QUESTIONS

What owners ask about this

What gross margin should a commercial subcontractor have?

It depends on the trade and the revenue band. In the $1M to $5M band, published figures go from 18% to 27% across the 48 trades that publish a figure. The CFOS target recalculates at your revenue: the net profit target plus the overhead target, so the three targets tie.

How does gross margin change as revenue grows?

Civil moves from 21% at $1M to $5M to 30% at $500M+. The indirect cost base grows in steps while revenue grows continuously, so the ratio moves as the business fills in behind each hire.

Where do these numbers come from?

The trade figures are the Run On CFOS reference. Gross margin and overhead come from figures CFMA and other sources publish by trade: CFMA's 2025 Benchmarker and the Jones Maresca and Company 2025 specialty contractor benchmarks among them. Net profit is computed, not surveyed: net profit = gross margin minus overhead, stated before taxes. CFMA's full Benchmarker is a licensed product and the survey itself is theirs. Every trade in the reference publishes a row of its own. Each new edition is checked against the latest CFMA and JMCO releases before publication. The full reference publishes 1,008 data points across 48 trades, 7 revenue bands, and 3 metrics.

Which trades have the strongest gross margin?

At $1M to $5M, Elevator and Curtain wall and glazing are at 27%. Trade structure causes most of the spread, and revenue band causes the rest.

How do I turn a percentage into a number I can act on?

Put your last twelve months of revenue into the box above the table. Every percentage on the page then shows the dollars beside it, including the distance between your industry average and the CFOS target.

AUTHOR
Josh Luebker
JOSH LUEBKER
MASTER ELECTRICIAN · 150+ PROJECTS · $2.1B+ MANAGED

Wrote CONTROL, the 8 step system behind these figures. More about the author.

Updated

8 Steps 60 Days

CONTROL is the full system, written for commercial subcontractors from $1M to $100M. It's out now. 8 steps, 6 working templates, and the order they install in. $9.99 ebook, $24.99 paperback.