CFOS for QuickBooks, coming January 2027See what you get
LEGALACCESSIBILITY
LEGAL

Accessibility

We want every contractor to be able to read and use this site. The standard we are aiming for is WCAG 2.1 level AA. We have not had the site formally audited, so we do not claim that it meets it.

WHAT THE SITE DOES

What is in place today

TEXT ALTERNATIVES
Every image has a text description, and the build refuses a page where one is missing.
STRUCTURE
Each page has one main heading, and headings appear in order. Pages have a language set.
KEYBOARD
Links, buttons and forms are real HTML elements, so they work from a keyboard.
MOTION
If your device asks for reduced motion, animations are switched off.
TABLES
Every cell in a data table has a label so they read in order on a phone.
SIZE AND LAYOUT
Pages are built to work at phone width, and images carry their dimensions so the page does not jump as it loads.
WHAT WE HAVE NOT CONFIRMED

Where we are less sure

We have not tested the site with a screen reader across the whole of it, and we have not checked every colour pairing against the contrast ratios WCAG sets. Videos play on YouTube and the booking calendar is SPM's booking app and the payment page is Stripe's, so those are tested by them, not here. The sample CEO report is a generated file and may fall short.

TELL US

If something does not work for you

Write to info@runoncfos.com with the page and what went wrong. We will fix it or give you the information another way. Sulphur Prairie Operations, LLC, Sulphur Rock, AR. How we handle your information is on the privacy page, and the rules for the site are on the terms page.

Updated

8 Steps 60 Days

CONTROL is the full system, written for commercial subcontractors from $1M to $100M. It's out now. 8 steps, 6 working templates, and the order they install in. $9.99 ebook, $24.99 paperback.