
#1 Best Seller in Construction Industry on Amazon

CONTROL
C.F.O.S. Construction Financial Operating System. 8 steps, six working templates, and the sequence they install in. It's out now, $9.99 ebook, $24.99 paperback.
An endorsement, the opening of chapter 2, and the part about why an all-in equipment rate does not show what the machine actually costs. Nothing to enter, nothing to join.
Buying for more than a few people? Orders of 10 or more copies cost $14.99 to $19.99 each, depending on quantity. See bulk pricing
Published October 1, 2026 by Sulphur Prairie Operations, LLC, doing business as Run On CFOS. Paperback ISBN-13 979-8187939664.
Edited by Holly Joyner, NYT bestselling ghostwriter and LinkedIn ghostwriter for business owners. Work with Holly: TheStorySpark.com
Luebker, J. (2026). CONTROL: C.F.O.S. Construction Financial Operating System. Run On CFOS. https://runoncfos.com/control
Names, three bios, logo and headshot files, and a block of markup to paste into a page are in the citation kit.
WHERE IS ALL THE MONEY GOING?
Your business isn't failing. The calls are coming in, the crews are busy, and you've built something substantial. But at the end of the month, the money's gone—and your end-of-year number never makes sense for how hard you worked. You're doing payroll math at 3 a.m. and watching your line of credit like a gas gauge on empty, with your house, your retirement, and your signature on the line.
Here it is plainly: You don't have a financial operating system. Not a bookkeeper doing their best, not a CPA at tax time, not one more software subscription that doesn't understand construction. You need a system that shows you how money actually moves through your business, and what to do about it when the numbers are wrong.
That's what CONTROL gives you. In eight steps and sixty days, Josh Luebker walks you through the same framework his firm uses to turn stressed, reactive subcontractors into businesses with 22–30% gross profit, 12% net profit, and $650,000 in the bank at all times, where the owner finally pays himself a real salary and can take a week off without everything falling apart.
This is not a book about accounting. It's a book about making you accountable to your business. It works in any software, any spreadsheet, or with pen and paper, because the principles never change.
CONTROL works—but only if you do.
Josh Luebker is the President of SPM The Construction CFO for subcontractors. He and his team have helped contractors from $1 million to $25 million stop struggling to collect money and start keeping it, pulling businesses back from $1.2 million in the red and building them into companies worth operating.
What is in it
Published, not asserted
Every benchmark the book refers to is published here in full, with sources.
Read by contractors, and by the people who clean up after them
Contracting isn't easy, and in my early days I made it much harder than it needed to be. But Josh's practical approach—and his proven track record—put simple but powerful concepts in the hands of construction owners. Concepts that, if put in place, will dramatically change the arc of your enterprise—and your life. As I read this book, I thought out loud (and also asked Josh): where were you in the mid-90s when I was struggling to get off the ground and gain altitude?!?! Reading this book and following its concepts is almost guaranteed to make you a more capable contractor.
Most contractors don't have a money problem. They have a visibility problem. Josh has built the rare book that fixes it the right way: not with a pep talk, but with a system. Eight steps, one monthly cadence, and a set of numbers you can actually hold your business to. Every chapter earns its place with a real contractor and a real result. If you want control and clarity over where your money goes, read this and then do what it says. The process works. Whether you show up for it is the only variable left.
Josh has thrown down an absolute master class in this exceptionally accessible look at what it really takes to run a successful construction company today—mastering cash flow and risk. Whether you've been in the industry for twenty years or twenty minutes, you'll find at least three 'Dang, I wished I'd learned that sooner!!' moments.
Josh is extremely analytical and cares about the financial systems so businesses can run like businesses and not hobbies. We have a shared client who built a landscaping business while working at the power company. His cash flow was all over the place, his pricing was on feeling, and his margin per job was a coin toss. Josh worked to implement the systems shared in this book and watched the debt go down and the cash flow increase.
Josh's rare perspective as an owner, operator, and financial expert highlights the common pitfalls in the industry: labor buried in overhead, retention getting taxed before anyone collects it, equipment booked as an expense. I see it constantly, across every trade, and Josh is the first person I've come across who explains why it keeps happening and what to actually do about it.
This is one of those rare books that doesn't just tell you what's wrong, it gives you the exact steps to fix it. Josh breaks down the financial side of running a construction company in plain language, without the jargon, so you can put it to work. Whether you're just starting out or you've been at it for decades, there's something in here that will change how you run your business.
I wasn't expecting a finance book to hit this close to home. What sets this book apart is that it doesn't stop at diagnosing the problem. Josh gives you real, usable solutions pulled straight from the field, not generic advice, but the kind of guidance that comes from someone who's actually been in the trenches with owners like us. I could barely put it down. It took me right back to when I was building my own crews, facing the same struggles so many of us face when we simply don't know what we don't know. This book doesn't just tell you what's broken; it gives you a way to fix it, regardless of whether you just started or have been doing this the same way for decades.
Posted by readers who tagged the author
Each screenshot opens the original post.

I received my copy of Control by Josh Luebker on Saturday and spent way too much of the weekend reading about business finance strategies. Josh makes it so simple, so systemized, and so straightforward that you can't help but want to implement what he shares. I thought we already had a pretty good money strategy going, but I hadn't finished chapter 1 on Job Costing Structure before I was spotting areas where we can improve. The QR codes for each chapter, which lead to spreadsheets and templates, are also really helpful. I highly recommend this one! Grab your copy on Amazon.

Mr Josh Luebker I read thru your book yesterday and I am impressed.
I don’t know that I’ve read anything on financing and running money in a business that is as simple and system oriented as what you laid out here. Love what you’re doing and your passion and energy you’re bringing along! Keep it up!
I know you have some pretty solid endorsements from men like Sy Kirby and Herb Sargent to name a few. I first heard about you on the Blue Collar Business Podcast and have been following along since.
Look forward to implementing more of your strategies and systems and gaining more clarity and less chaos in the business I’m working on.
Keep doing what you’re doing it’s making a difference!
What readers ask
What is CONTROL about?
CONTROL: C.F.O.S. Construction Financial Operating System lays out 8 steps that take a commercial subcontractor from guessing to knowing. Job cost structure, equipment cost basis, overhead, estimating alignment, software and bookkeeping, project management standards, monthly cadence, and standards and accountability.
Who is it written for?
Commercial subcontractors from $1M to $100M doing commercial progress-payment work. Owners, presidents and operators, not accountants.
When does it publish?
It's out now. On release day the Kindle edition was the #1 New Release in Financial Accounting, captured October 1, 2026 at 8:42 AM Central.
What does it cost?
$9.99 for the ebook and $24.99 for the paperback, both on Amazon. The working templates are included rather than sold separately: the codes printed in the book open every one of them on this site.
Do the templates come with it?
Six chapters have a QR code that opens the working template for that chapter: chapters 1, 2, 3, 4, 6 and 7. Chapters 5 and 8 don't have one, because what they describe is a cadence rather than a file.
Do I have to read it in order?
The steps install in order because each one needs the one before it in place. You can't calculate an overhead rate until job costs are booked to the jobs, because the superintendent and the small tools are often booked to overhead, and that makes both numbers wrong. You can't fix estimating without a job cost structure to line the estimate up against, and a monthly cadence doesn't work on data no one trusts. Reading out of order is fine. Installing out of order produces numbers the field won't trust.
Is it an accounting book?
No. It's about knowing what your numbers mean and what to do when one of them turns red. It works with any software, any spreadsheet or a legal pad, because the principles don't change with the tool.
Is it a book or a workbook?
More of a workbook. Every chapter ends with a template or an action step, and the QR codes open the tools that go with them. Reading it and skipping the action steps changes nothing in the business.
Why not just buy software to fix it?
A tool fixes one piece, and every piece depends on the one before it. Contractors who buy a tool for one problem usually end up back where they started. The tool was fine, and the numbers going into it weren't.
Reading CONTROL and want your own numbers checked against the CFOS standard? The Financial Health Snapshot builds a CEO Report from your last twelve months, sets every figure against your trade, and walks you through it on a 60 minute call. SPM The Construction CFO (Sulphur Prairie Management, LLC) is a separate firm, and the same author leads it.


Within 48 hours of its October 1, 2026 release the book ranked on Amazon:
- #1 in Construction Industry
- #1 in Home Improvement Estimating
- #9 in Financial Accounting
Captured October 2, 2026 at 8:03 PM Central.
