Overhead calculation
What indirect cost really comes to at your size, and the rate your estimating template should be carrying.
Where this step sits
The rules and targets underneath it
What your trade carries
Overhead rates for all 48 trades across 7 revenue bands, with the CFOS target beside them.
Contractors where this step did the work
What owners ask
What is the overhead calculation step?
What indirect cost really comes to at your size, and the rate your estimating template should be carrying. It's step 03 of 8 in CONTROL, drawn from chapter 3.
Does the order make a difference?
Yes. This step depends on job cost structure and equipment cost basis, so installing it first produces numbers nobody trusts.
What does it change downstream?
It feeds estimating system, monthly cadence, standards and accountability. A change here moves every one of those.
What breaks if I skip step 03?
3 later steps read from it: 04, estimating system, 07, monthly cadence, 08, standards and accountability. Skip it and those run on numbers that were never established, so the output looks finished and isn't.
Where does step 03 sit in the sequence?
Position 3 of 8 once the dependencies are resolved. It waits on 01 and 02. 3 steps wait on it. Most owners install all 8 inside 60 days.
