STEP 03 OF 08 · CHAPTER 3

Overhead calculation

What indirect cost really comes to at your size, and the rate your estimating template should be using.

PUBLISHED FIGURES

What your trade runs

Overhead rates for all 48 trades across 7 revenue bands, with the CFOS target beside them up to $10M to $25M.

PROOF

Contractors where this step did the work

QUESTIONS

What owners ask

What is the overhead calculation step?

What indirect cost really comes to at your size, and the rate your estimating template should be using. It's step 03 of 8 in CONTROL, drawn from chapter 3.

Does the order make a difference?

Yes. This step depends on job cost structure and equipment cost basis, so installing it first produces numbers the field won't trust.

What does it change downstream?

It feeds estimating system, monthly cadence, standards and accountability. A change here moves every one of those.

What fails if I skip step 03?

3 later steps read from it: 04, estimating system, 07, monthly cadence, 08, standards and accountability. Skip it and those run on numbers that were never established, so the output looks finished and isn't.

Where does step 03 fit in the sequence?

Position 3 of 8 once the dependencies are resolved. It waits on 01 and 02. 3 steps wait on it. Most owners install all 8 inside 60 days.

AUTHOR
Josh Luebker
JOSH LUEBKER
MASTER ELECTRICIAN · 150+ PROJECTS · $2.1B+ MANAGED

Wrote CONTROL, the 8 step system behind these figures. More about the author.

8 Steps 60 Days

CONTROL is the full system, written for commercial subcontractors from under $1M to $100M. It's out now. 8 steps, 6 working templates, and the order they install in. $9.99 ebook, $24.99 paperback.