CFOS for QuickBooks, coming January 2027See what you get
CFOSPLUMBING
CFOS FOR QUICKBOOKS · PLUMBING

Job costing software for plumbing contractors

Plumbing gets paid by phase: underground, rough-in, top-out and trim, each with its own inspection. CFOS for QuickBooks costs every phase and every fixture package to the job, so you know which trip lost money.

Every Monday we email the list what we built that week, with screenshots or a short video, and we email you the day it opens. Your address stays with Run On CFOS. One click unsubscribes.

Early access offer: everyone on this list before CFOS for QuickBooks opens gets 12 months with no subscription fee, counted from the day it opens in January 2027. During those 12 months the only charge is AI use, billed every Monday at what it costs us plus 10 percent for the work of billing it. Pay by bank transfer (ACH) and that is the whole charge, and pay by card and 3 percent is added for the card fee. After the 12 months the regular monthly price for your size starts, and you can cancel anytime before then with nothing owed but the AI you used.

30 days free, a 90-day money-back guarantee, and cancel anytime. It opens January 2027. We email you every Monday with what we built, and the day it opens.

How plumbing bills and where the money leaks

Commercial plumbing bills on a schedule of values with a pay app each month and retainage on every line. Multifamily and production homes are often priced per unit or per fixture and billed as each phase passes inspection: underground, rough-in or top-out, then trim. Service and repair work bills by the call, and it shouldn't share a budget with a forty unit building.

The underground is the first place money goes missing. You lay out, trench, set sleeves and test before the slab is poured, and if the layout moves or the GC pours late, you're back with a crew and an inspector. Water heaters, fixture packages and tubs are often bought early and stored, and a tub set at framing can be chipped or full of debris by the time trim comes.

Then there's damage from other trades. A drywall screw through a supply line, a framer cutting a vent or a concrete crew pouring over a cleanout all turn into repair labor. That labor is yours unless someone signs a T&M ticket for it, and every failed inspection or repair trip is a mobilization the per-fixture price didn't include.

How plumbing costs split and what CFOS tracks

Plumbing costs split into pipe and fittings, fixtures and equipment, labor by phase, gas piping, permits and inspection fees, and subcontracted items like insulation or site utilities. Material is two different things: commodity pipe that's bought in bulk and drawn from the shop, and fixture packages that belong to one job. Labor is the bigger risk, because underground, top-out and trim each move at their own pace.

CFOS imports your estimate as the job budget by cost code and compares it to actual cost from QuickBooks Online every hour. With three levels of cost code, a building, a floor or a unit type can be a level above the phase lines. On a multifamily job that tells you whether the second building's top-out cost more than the first.

Bills emailed to your bills inbox are read, coded to the job and checked against the PO. A fixture package for one building doesn't get charged to another, and backordered fixtures billed early are easy to find. Labor burden is set by class, so a journeyman plumber and an apprentice each cost what they really cost.

Workflow from the field to the office

The foreman files a daily with the crew, the equipment and photos. Photos of the underground before the pour and the rough-in before the walls close are the record you need when something is covered up. If the GC adds a fixture or moves a wall, the T&M ticket goes on the daily and the GC signs it on site, and it becomes a change order draft.

Field time is approved and goes to QuickBooks Payroll with the job and the phase it was worked on. That keeps a return trip for a failed inspection on the job instead of lost in a week of hours. On public work the certified payroll week is laid out from approved time with wage classes, and deductions stay with your payroll company.

The PM builds the pay app from the schedule of values, with stored fixtures where the contract allows and retainage by line. Inspections, RFIs and punch items are tracked on the job. Pay app due dates send the PM a reminder, so a phase that passed inspection gets billed the same month.

What the owner sees every month

Each month the PM enters cost to complete on every open job and it gets approved. The WIP schedule shows over and under billing, so a job that's billed through rough-in but hasn't spent its rough-in labor yet is easy to see. The master WIP puts every job on one page.

Your CEO Report grades gross margin, overhead and net profit before taxes against the published average and CFOS target for plumbing at your size. If you price per fixture, the closed jobs tell you what a fixture really cost you by phase. Your next bid starts from that number instead of last year's guess.

The 13 week cash forecast reads your QuickBooks Online data and your pay apps and marks the lowest week. Retainage on plumbing often waits on final inspection and the certificate of occupancy for the whole building. AR aging and a collections list keep that retainage from being forgotten after your crew has moved on.

COST CODES

Plumbing cost codes, matched to QuickBooks

Each group below is one set of cost codes in CFOS. Bills, time and equipment post to them. QuickBooks keeps the books underneath, so your bookkeeper sees the same numbers.

Cost code groupWhat goes on it
Underground and below slabLayout, trenching, sleeves, waste and water lines below the slab, and the test.
Rough-in and top-outDrain, waste, vent and supply piping in the walls and ceilings before cover.
Trim and finishSetting fixtures, faucets and trim after the walls are finished.
FixturesFixture packages by building or unit, including stored fixtures billed ahead of trim.
Water heaters and equipmentWater heaters, pumps, softeners, backflow preventers and expansion tanks.
Gas pipingGas lines, regulators, meter sets and the pressure test.
Pipe, fittings and hangersBulk pipe, fittings, hangers and supports drawn from the shop.
Permits and inspection tripsPermit fees, inspection fees and return trips after a failed inspection.
Repairs to damage by othersFixing work another trade damaged, tied to the signed T&M ticket.
Change ordersAdded fixtures and moved walls with their own coding.
THE NUMBERS FOR PLUMBING

How plumbing contractors do, by revenue

Each row shows the all-trade average, this trade's average and the CFOS target. These are the numbers your own job costing gets graded against. Net profit is before taxes in every row.

RevenueOverheadGross marginNet profit, before taxes
$1M to $5M15.1% all-trade average
16% Plumbing
14.1% CFOS target
22.1% all-trade average
25% Plumbing
25% CFOS target
7% all-trade average
9% Plumbing
11% CFOS target
$5M to $10M14.1% all-trade average
15% Plumbing
13.1% CFOS target
23.4% all-trade average
26% Plumbing
26% CFOS target
9.4% all-trade average
11% Plumbing
12.9% CFOS target
$10M to $25M13.1% all-trade average
14% Plumbing
12.1% CFOS target
24.6% all-trade average
27% Plumbing
27.1% CFOS target
11.5% all-trade average
13% Plumbing
15% CFOS target
$25M to $50M12.1% all-trade average
13% Plumbing
11.1% CFOS target
25.7% all-trade average
28% Plumbing
28.2% CFOS target
13.7% all-trade average
15% Plumbing
17.2% CFOS target
HOW THE NET PROFIT FIGURES ARE BUILT.

Gross margin and overhead come from figures CFMA, Jones Maresca and other sources publish by trade and size. Net profit is computed, not surveyed: net profit = gross margin minus overhead. Nothing comes out for taxes, interest or other income and expense, so it is a before tax figure, on the same basis as CFMA's net income before taxes.

CFMA's 2025 medians are 7.1 percent before interest and taxes and 6.7 percent net income before taxes. Gross margin minus overhead leaves out interest and other income and expense, so a figure here can come in a little above or below a reported net income on the same business.

Above the $10M to $25M band the gross margin and overhead rows are a modeled extension of the same curves. They have not been reconciled against the licensed CFMA Benchmarker, so read those bands as a model and not as a survey result.

See every figure for plumbing.

90-DAY MONEY-BACK · CANCEL ANYTIME

Get on the list for the day it opens

30 days free, a 90-day money-back guarantee, and cancel anytime.

Every Monday we email the list what we built that week, with screenshots or a short video, and we email you the day it opens. Your address stays with Run On CFOS. One click unsubscribes.

Early access offer: everyone on this list before CFOS for QuickBooks opens gets 12 months with no subscription fee, counted from the day it opens in January 2027. During those 12 months the only charge is AI use, billed every Monday at what it costs us plus 10 percent for the work of billing it. Pay by bank transfer (ACH) and that is the whole charge, and pay by card and 3 percent is added for the card fee. After the 12 months the regular monthly price for your size starts, and you can cancel anytime before then with nothing owed but the AI you used.

30 days free, a 90-day money-back guarantee, and cancel anytime. It opens January 2027. We email you every Monday with what we built, and the day it opens.

QUESTIONS

What plumbing contractors ask

Can I price and track a job per fixture or per unit?

Your estimate imports as the budget by cost code, so you can bring in quantities from your takeoff. Use the three levels of cost code for building or unit type, then phase. When the job closes, you can work out what each fixture or unit cost.

How do I get paid for a line another trade damaged?

Take photos, put the repair on the daily as a T&M ticket and have the GC sign it on site. It becomes a change order draft for the next pay app. If the GC won't sign, the cost is still on its own code so you see what it took.

Can I bill fixtures I bought before trim?

Yes, as stored materials on the schedule of values where the contract allows. The WIP schedule shows over and under billing each month. Fixtures on a shelf and not on a pay app are money you're funding.

Can I keep service calls apart from new construction?

Yes. Put service on its own jobs or cost codes so repair work doesn't blend into contract jobs. Each side gets its own actual cost, and the CEO Report covers the whole company.

Do I have to leave QuickBooks Online to use CFOS on plumbing jobs?

No. CFOS reads from and writes to QuickBooks Online, and QuickBooks keeps your books. It doesn't work with QuickBooks Desktop.

Updated

8 Steps 60 Days

CONTROL is the full system, written for commercial subcontractors from $1M to $100M. It's out now. 8 steps, 6 working templates, and the order they install in. $9.99 ebook, $24.99 paperback.