CFOS for QuickBooks, coming January 2027See what you get
CFOSELECTRICAL
CFOS FOR QUICKBOOKS · ELECTRICAL

Job costing software for electrical contractors

Electrical jobs bill on a schedule of values. Payment comes late. CFOS reads your QuickBooks Online jobs and tracks labor hours against material by cost code.

Every Monday we email the list what we built that week, with screenshots or a short video, and we email you the day it opens. Your address stays with Run On CFOS. One click unsubscribes.

Early access offer: everyone on this list before CFOS for QuickBooks opens gets 12 months with no subscription fee, counted from the day it opens in January 2027. During those 12 months the only charge is AI use, billed every Monday at what it costs us plus 10 percent for the work of billing it. Pay by bank transfer (ACH) and that is the whole charge, and pay by card and 3 percent is added for the card fee. After the 12 months the regular monthly price for your size starts, and you can cancel anytime before then with nothing owed but the AI you used.

30 days free, a 90-day money-back guarantee, and cancel anytime. It opens January 2027. We email you every Monday with what we built, and the day it opens.

How electrical bills and where the money leaks

Most electrical work bills progress on a schedule of values, one pay app a month, with retainage held back on every line. Gear, wire and fixtures get billed as stored material when they're bought ahead, and the GC holds retainage on that too, even though you paid the supplier in full. Change orders pile up between pay apps, and the ones that never get signed are the ones that cost you.

The leaks are easy to find once you look. You come back to the same building four to six times, so the rough-in, trim and service each get a share of the budget, and a single line that says electrical keeps you from seeing which trip lost money. Temp power, lighting controls and fire alarm tie-ins get pushed into the base contract when the plans change. Your crew works out of scope at the GC's request, and without a signed T&M ticket it's your cost.

How electrical costs split and what CFOS tracks

Electrical is a labor and material trade, and the two move on different clocks. Labor is hours times a burdened rate, so a job can meet its bid hours and still lose money if the rate you bid is off. Material is gear with long lead times, wire and conduit bought in bulk, and fixtures that get delivered late. You need both tracked against the estimate by cost code, not lumped into one total.

CFOS imports your estimate as the job budget by cost code and compares it to the actual cost from QuickBooks Online, updated every hour. Labor burden is set by class, so a journeyman hour and an apprentice hour cost what they really cost. Vendor bills emailed to your bills inbox are read, coded to the job and checked against the PO, so gear ordered for one job isn't charged to another.

Workflow from the field to the office

The foreman files a daily with the crew, the equipment and photos. If the GC asks for extra work, the T&M ticket goes on that daily and the GC signs it on site. It becomes a change order draft that goes on the next pay app, so the office doesn't have to remember it three weeks later.

Field time is entered by the crew, approved, and goes to QuickBooks Payroll. Hours are posted to the cost code they were worked on, so the office can see rough-in labor separate from trim labor. The PM then builds the pay app from the schedule of values, with retainage and stored materials, and sends it to the GC from QuickBooks or logs it for the GC's own system.

What the owner sees every month

Each month the PM enters cost to complete on every open job and it gets approved. That goes into a WIP schedule with over and under billing, so you can see which jobs are billed before the work is done and which ones you're funding. The master WIP gives you the whole company on one page.

Your CEO Report grades gross margin, overhead and net profit before taxes against the published average and the CFOS target for electrical at your size. The 13 week cash forecast reads your QuickBooks and your pay apps and marks the lowest week. If retainage on gear is what's holding back your cash, you'll see it before the payroll week, not after it.

COST CODES

Electrical cost codes, matched to QuickBooks

Each group below is one set of cost codes in CFOS. Bills, time and equipment post to them. QuickBooks keeps the books underneath, so your bookkeeper sees the same numbers.

Cost code groupWhat goes on it
Rough-in laborConduit, boxes, pulling wire and hangers in the walls, ceilings and slab before inspection.
Trim and finish laborDevices, plates, fixtures and panels set after the walls are closed.
Gear and switchgearPanels, switchboards, transformers and generators, including deposits and stored material.
Wire, conduit and fittingsBulk material bought for the job and drawn from the shop.
Lighting and controlsFixtures, drivers, lighting control panels and programming time.
Fire alarm and low voltageDevices, panels, cable and testing when it's in your scope.
Temporary powerTemp panels, cords and distribution, tracked by month so the duration is visible.
Permits, inspections and testingPermit fees, inspection call backs, and startup and testing labor.
Equipment and vehiclesLifts, trucks and tools charged to the job by day.
Change orders and T&MExtra work with its own coding, tied to the signed ticket.
THE NUMBERS FOR ELECTRICAL

How electrical contractors do, by revenue

Each row shows the all-trade average, this trade's average and the CFOS target. These are the numbers your own job costing gets graded against. Net profit is before taxes in every row.

RevenueOverheadGross marginNet profit, before taxes
$1M to $5M15.1% all-trade average
16% Electrical
14.1% CFOS target
22.1% all-trade average
25% Electrical
25% CFOS target
7% all-trade average
9% Electrical
11% CFOS target
$5M to $10M14.1% all-trade average
15% Electrical
13.1% CFOS target
23.4% all-trade average
27% Electrical
26% CFOS target
9.4% all-trade average
12% Electrical
12.9% CFOS target
$10M to $25M13.1% all-trade average
14% Electrical
12.1% CFOS target
24.6% all-trade average
28% Electrical
27.1% CFOS target
11.5% all-trade average
14% Electrical
15% CFOS target
$25M to $50M12.1% all-trade average
13% Electrical
11.1% CFOS target
25.7% all-trade average
29% Electrical
28.2% CFOS target
13.7% all-trade average
16% Electrical
17.2% CFOS target
HOW THE NET PROFIT FIGURES ARE BUILT.

Gross margin and overhead come from figures CFMA, Jones Maresca and other sources publish by trade and size. Net profit is computed, not surveyed: net profit = gross margin minus overhead. Nothing comes out for taxes, interest or other income and expense, so it is a before tax figure, on the same basis as CFMA's net income before taxes.

CFMA's 2025 medians are 7.1 percent before interest and taxes and 6.7 percent net income before taxes. Gross margin minus overhead leaves out interest and other income and expense, so a figure here can come in a little above or below a reported net income on the same business.

Above the $10M to $25M band the gross margin and overhead rows are a modeled extension of the same curves. They have not been reconciled against the licensed CFMA Benchmarker, so read those bands as a model and not as a survey result.

See every figure for electrical.

90-DAY MONEY-BACK · CANCEL ANYTIME

Get on the list for the day it opens

30 days free, a 90-day money-back guarantee, and cancel anytime.

Every Monday we email the list what we built that week, with screenshots or a short video, and we email you the day it opens. Your address stays with Run On CFOS. One click unsubscribes.

Early access offer: everyone on this list before CFOS for QuickBooks opens gets 12 months with no subscription fee, counted from the day it opens in January 2027. During those 12 months the only charge is AI use, billed every Monday at what it costs us plus 10 percent for the work of billing it. Pay by bank transfer (ACH) and that is the whole charge, and pay by card and 3 percent is added for the card fee. After the 12 months the regular monthly price for your size starts, and you can cancel anytime before then with nothing owed but the AI you used.

30 days free, a 90-day money-back guarantee, and cancel anytime. It opens January 2027. We email you every Monday with what we built, and the day it opens.

QUESTIONS

What electrical contractors ask

Can CFOS track labor hours against material on each electrical job?

Yes. Seven cost types and three levels of cost code let you budget labor and material on separate lines, and the actuals come from QuickBooks Online every hour. Field time is approved and posted to the cost code it was worked on.

How does CFOS handle retainage on gear and stored material?

The pay app lists stored materials on the schedule of values and applies retainage by line. You can see what you've billed and what the GC is holding. That tells you how much of the gear cost you're still funding.

What about T&M tickets the GC won't sign?

The ticket goes on the foreman's daily and the GC signs it on site, before the crew leaves. It then becomes a change order draft for the next pay app. If it isn't signed, you can see that on the daily instead of finding out at closeout.

Can I code a job by phase, like rough-in and trim?

Yes. Cost codes have three levels, so a phase is a level above the labor and material lines. Your estimate imports as the budget by cost code, so the job costing lines up with how you bid it.

Does this replace QuickBooks Online?

No. CFOS works on top of QuickBooks Online and reads from and writes to it. QuickBooks keeps your books, and you still pay Intuit for it separately.

Updated

8 Steps 60 Days

CONTROL is the full system, written for commercial subcontractors from $1M to $100M. It's out now. 8 steps, 6 working templates, and the order they install in. $9.99 ebook, $24.99 paperback.