CFOS for QuickBooks, coming January 2027See what you get
CFOSDRYWALL
CFOS FOR QUICKBOOKS · DRYWALL

Job costing software for drywall contractors

Drywall bills by area or floor and has finish levels to track. Callbacks and change orders cost money. CFOS ties QuickBooks Online costs to your estimate so you can see which jobs paid.

Every Monday we email the list what we built that week, with screenshots or a short video, and we email you the day it opens. Your address stays with Run On CFOS. One click unsubscribes.

Early access offer: everyone on this list before CFOS for QuickBooks opens gets 12 months with no subscription fee, counted from the day it opens in January 2027. During those 12 months the only charge is AI use, billed every Monday at what it costs us plus 10 percent for the work of billing it. Pay by bank transfer (ACH) and that is the whole charge, and pay by card and 3 percent is added for the card fee. After the 12 months the regular monthly price for your size starts, and you can cancel anytime before then with nothing owed but the AI you used.

30 days free, a 90-day money-back guarantee, and cancel anytime. It opens January 2027. We email you every Monday with what we built, and the day it opens.

How drywall bills and where the money leaks

Drywall subcontracts usually bill by area or by floor on a schedule of values, with a pay app each month, change orders and retainage. The phases are framing, board install, taping and finishing, and each one can be billed as it's completed. Unit price work bills by the square foot or the sheet, and that suits tenant improvement and repeat work.

The leaks are small until you add them up. Your crew goes back to the same area many times for punch and patching, and no one signs a ticket for it. A finish level upgraded after the walls are primed turns into extra labor no one priced. Waiting on rough-in inspection, or on another trade's work, means paying a crew that can't hang a sheet. Material is bought on one quote and the job goes on for months.

How drywall costs split and what CFOS tracks

Drywall cost is mostly labor, and the rest is board, studs, track, mud, tape, insulation and equipment. Piece rate and hourly labor can be mixed on the same job, so it helps to track hours and production by area and phase. Board install, taping and finishing rarely cost the same per square foot, and the numbers you need are split that way.

CFOS compares your estimate by cost code against actual cost from QuickBooks Online every hour. Time is entered in the field, approved, and posted by job and cost code, with labor burden by class. Vendor bills emailed to your bills inbox are read, coded and checked against the PO, so a board delivery is charged to the right floor of the right job.

Workflow from the field to the office

The foreman files a daily with the crew, equipment and photos, which documents delays caused by other trades and the date an area was ready. If the GC wants extra work or a finish level changed, the T&M ticket goes on the daily and the GC signs it on site. It becomes a change order draft for the next pay app.

Time is approved and goes to QuickBooks Payroll. The PM bills by area or floor on the schedule of values, and the pay app holds retainage and stored material where the contract allows. Punch items are tracked, so callbacks are counted on the job, not lost.

What the owner sees every month

Each month the PM enters cost to complete on open jobs, and it gets approved. The WIP schedule shows over and under billing, so you can tell if a job is billed before the work is done or after it. The master WIP shows the whole company.

Your CEO Report grades gross margin, overhead and net profit before taxes against the published average and CFOS target for drywall at your size. The 13 week cash forecast reads your pay apps and marks the lowest week. Callback cost shows on the jobs that caused it, so you can price the next one better.

COST CODES

Drywall cost codes, matched to QuickBooks

Each group below is one set of cost codes in CFOS. Bills, time and equipment post to them. QuickBooks keeps the books underneath, so your bookkeeper sees the same numbers.

Cost code groupWhat goes on it
Metal framing and trackStuds, track, soffits and furring, labor and material by area.
Board installLabor and board for walls and ceilings, including specialty board.
Taping and finishingMud, tape and finish labor, tracked by finish level.
Insulation and acousticalBatts, sound attenuation and acoustical sealant where in scope.
Specialty board and shieldingMoisture resistant, fire rated or lead lined board, with deposits and lead times.
Texture and sprayTexture, primer and spray finishes.
Equipment and scaffoldingLifts, stilts, scaffolds, mixers and trucks charged to the job.
Delivery and cleanupMaterial drops, stocking floors and debris removal.
Punch and callbacksReturn trips, patching and warranty work, kept so you can see their cost.
Change orders and T&MAdded scope coded separately, tied to the signed ticket.
THE NUMBERS FOR DRYWALL

How drywall contractors do, by revenue

Each row shows the all-trade average, this trade's average and the CFOS target. These are the numbers your own job costing gets graded against. Net profit is before taxes in every row.

RevenueOverheadGross marginNet profit, before taxes
$1M to $5M15.1% all-trade average
13% Drywall
14.1% CFOS target
22.1% all-trade average
19% Drywall
25% CFOS target
7% all-trade average
6% Drywall
11% CFOS target
$5M to $10M14.1% all-trade average
12% Drywall
13.1% CFOS target
23.4% all-trade average
21% Drywall
26% CFOS target
9.4% all-trade average
9% Drywall
12.9% CFOS target
$10M to $25M13.1% all-trade average
11% Drywall
12.1% CFOS target
24.6% all-trade average
22% Drywall
27.1% CFOS target
11.5% all-trade average
11% Drywall
15% CFOS target
$25M to $50M12.1% all-trade average
10% Drywall
11.1% CFOS target
25.7% all-trade average
23% Drywall
28.2% CFOS target
13.7% all-trade average
13% Drywall
17.2% CFOS target
HOW THE NET PROFIT FIGURES ARE BUILT.

Gross margin and overhead come from figures CFMA, Jones Maresca and other sources publish by trade and size. Net profit is computed, not surveyed: net profit = gross margin minus overhead. Nothing comes out for taxes, interest or other income and expense, so it is a before tax figure, on the same basis as CFMA's net income before taxes.

CFMA's 2025 medians are 7.1 percent before interest and taxes and 6.7 percent net income before taxes. Gross margin minus overhead leaves out interest and other income and expense, so a figure here can come in a little above or below a reported net income on the same business.

Above the $10M to $25M band the gross margin and overhead rows are a modeled extension of the same curves. They have not been reconciled against the licensed CFMA Benchmarker, so read those bands as a model and not as a survey result.

See every figure for drywall.

90-DAY MONEY-BACK · CANCEL ANYTIME

Get on the list for the day it opens

30 days free, a 90-day money-back guarantee, and cancel anytime.

Every Monday we email the list what we built that week, with screenshots or a short video, and we email you the day it opens. Your address stays with Run On CFOS. One click unsubscribes.

Early access offer: everyone on this list before CFOS for QuickBooks opens gets 12 months with no subscription fee, counted from the day it opens in January 2027. During those 12 months the only charge is AI use, billed every Monday at what it costs us plus 10 percent for the work of billing it. Pay by bank transfer (ACH) and that is the whole charge, and pay by card and 3 percent is added for the card fee. After the 12 months the regular monthly price for your size starts, and you can cancel anytime before then with nothing owed but the AI you used.

30 days free, a 90-day money-back guarantee, and cancel anytime. It opens January 2027. We email you every Monday with what we built, and the day it opens.

QUESTIONS

What drywall contractors ask

Can I bill drywall by floor or area?

Yes. Your schedule of values can have a line for each floor or area, and the pay app bills the percent complete with retainage. Unit price pay apps are supported too.

How do I track finish levels?

Use cost codes under taping and finishing for each level, and import your estimate as the budget. When a level changes mid job, a signed T&M ticket keeps the added cost visible. It becomes a change order draft for the next pay app.

Can CFOS handle piece rate and hourly crews on the same job?

Time entry captures hours by job and cost code. You can track production by area against the budget. That lets you compare piece rate and hourly work on the same basis.

What about callbacks after the job closes?

Code punch and warranty work to its own cost code or job so the cost is visible. The daily and the photos keep a record of what was done. They also show when it was done.

Does CFOS replace QuickBooks Online?

No. It works on top of QuickBooks Online, which keeps the books. Intuit bills QuickBooks Online separately.

Updated

8 Steps 60 Days

CONTROL is the full system, written for commercial subcontractors from $1M to $100M. It's out now. 8 steps, 6 working templates, and the order they install in. $9.99 ebook, $24.99 paperback.