Job costing software for acoustic ceiling contractors
Acoustic ceilings go in twice: grid before the above ceiling inspection, tile after the other trades finish. CFOS ties QuickBooks Online costs to your estimate by floor and phase, so you can see what each ceiling cost to finish.
We email you when CFOS for QuickBooks opens, plus a few updates before then. Your address stays with Run On CFOS. One click unsubscribes.
30 days free, a 90-day money-back guarantee, and cancel anytime. It opens January 2027. We email you the day it opens.
How acoustic ceiling bills and where the money leaks
Acoustic ceiling work is bid by the square foot of ceiling, with separate prices for grid, tile, specialty ceilings and wall panels. Commercial jobs bill a schedule of values each month with retainage, and a good schedule splits each floor into a grid line and a tile line. That split counts because grid and tile go in weeks or months apart, and the GC pays for what's in place.
The first leak is the wait between the two trips. Grid goes up, then the electricians, sprinkler fitters and duct crews work above it until the inspection passes. Your crew comes back to drop tile, and by then some of the grid is bent or moved and has to be reset at your cost.
The second leak is tile pulled and damaged by other trades after you've dropped it. Lay-in tile that comes down for a valve or a light fixture goes back stained, chipped or not at all. Without a signed ticket, the replacement tile and the labor to set it are yours, along with any attic stock the owner was promised.
How acoustic ceiling costs split and what CFOS tracks
Ceiling cost splits into grid and hangers, tile, specialty ceilings like wood, metal panels and clouds, seismic bracing, lifts and labor. Tile and specialty panels are ordered by the pallet on long lead times, and a color or edge detail changed late leaves you owning pallets you can't return. Labor on a large open office floor and labor in corridors full of soffits and light fixtures cost very different amounts per square foot.
CFOS imports your estimate as the job budget by cost code and compares it to actual cost from QuickBooks Online every hour. With grid labor, tile labor and specialty labor on separate codes, you can see which part of the ceiling took the extra hours. Seismic bracing and perimeter trim get their own lines too, since they're labor heavy for the area they cover.
Vendor bills emailed to your bills inbox are read, coded to the job and checked against the PO, so a tile delivery goes on the floor it was ordered for. Equipment daily rates charge your own scissor lifts and trucks to the job each day they're on a daily. Rented lifts come in on the vendor bill and are coded the same way.
Workflow from the field to the office
The foreman files a daily with the crew, the equipment and photos. Pictures of finished grid before other trades go above it, and of tile after it's dropped, are the record you need when a GC asks why the ceiling needs another trip. The daily also records the date each area passed inspection and was released for tile.
When the GC asks your crew to pull and replace tile for another trade, or to add a cloud or a bulkhead, a T&M ticket is attached to the daily and the GC signs it on site. It becomes a change order draft for the next pay app. Damaged tile replacement is priced from the same rate sheet every time, so the office doesn't argue it from memory.
Field time is approved and goes to QuickBooks Payroll, posted to grid, tile or specialty by floor. The PM builds the pay app from the schedule of values, with retainage and with tile stored on site billed as stored material where the contract allows. Punch items from the ceiling walk are tracked, so the last trip has a list and a date.
What the owner sees every month
Each month the PM enters cost to complete on every open job, and it gets approved. The WIP schedule shows over and under billing, which on a ceiling job tells you whether the grid billing still covers the tile labor to come. The master WIP shows every job together.
Your CEO Report grades gross margin, overhead and net profit before taxes against the published average and CFOS target for acoustic ceilings at your size. You see how you compare with the trade, and with your own last year. The 13 week cash forecast reads your pay apps and marks the lowest week, which helps when a big tile order comes due before the GC pays.
Return trips and replaced tile stay on the jobs that caused them, coded so you can count them. Over a year that tells you which GCs and which building types cost extra trips. You can also ask Claude or ChatGPT about your own jobs, read only, limited to what your sign in allows.
Acoustic ceiling cost codes, matched to QuickBooks
Each group below is one set of cost codes in CFOS. Bills, time and equipment post to them. QuickBooks keeps the books underneath, so your bookkeeper sees the same numbers.
| Cost code group | What goes on it |
|---|---|
| Grid and hangers | Main runners, cross tees, wall angle, hanger wire and anchors, labor and material. |
| Lay-in tile | Acoustic tile by the carton, and the labor to drop it after inspection. |
| Specialty ceilings | Wood, metal panel, linear and cloud ceilings, with deposits and long lead times. |
| Seismic bracing and trim | Compression posts, splay wires, perimeter clips and edge trim. |
| Wall panels and baffles | Fabric wrapped panels, baffles and sound absorbing wall treatment. |
| Lifts and equipment | Scissor lifts, rolling scaffolds, trucks and your own equipment by the day. |
| Pulled and replaced tile | Tile damaged or removed by other trades, plus the labor to reset it. |
| Attic stock and freight | Extra cartons owed to the owner, freight and delivery to each floor. |
| Punch and cleanup | Ceiling walk punch, stained tile swaps, carton removal and haul off. |
| Change orders and T&M | Added scope coded separately, tied to the signed ticket. |
How acoustic ceiling contractors do, by revenue
Each row shows the all-trade average, this trade's average and the CFOS target where one is published. These are the numbers your own job costing gets graded against. Net profit is before taxes in every row.
| Revenue | Overhead | Gross margin | Net profit, before taxes |
|---|---|---|---|
| $1M to $5M | 15.1% all-trade average 13% Acoustic ceiling 14.1% CFOS target | 22.1% all-trade average 21% Acoustic ceiling 25% CFOS target | 7% all-trade average 8% Acoustic ceiling 11% CFOS target |
| $5M to $10M | 14.1% all-trade average 12% Acoustic ceiling 13.1% CFOS target | 23.4% all-trade average 22% Acoustic ceiling 26% CFOS target | 9.4% all-trade average 10% Acoustic ceiling 12.9% CFOS target |
| $10M to $25M | 13.1% all-trade average 11% Acoustic ceiling 12.1% CFOS target | 24.6% all-trade average 23% Acoustic ceiling 27.1% CFOS target | 11.5% all-trade average 12% Acoustic ceiling 15% CFOS target |
| $25M to $50M | 12.1% all-trade average 10% Acoustic ceiling | 25.7% all-trade average 24% Acoustic ceiling | 13.7% all-trade average 14% Acoustic ceiling |
Gross margin and overhead come from figures CFMA, Jones Maresca and other sources publish by trade and size. Net profit is computed, not surveyed: net profit = gross margin minus overhead. Nothing comes out for taxes, interest or other income and expense, so it is a before tax figure, on the same basis as CFMA's net income before taxes.
CFMA's 2025 medians are 7.1 percent before interest and taxes and 6.7 percent net income before taxes. Gross margin minus overhead leaves out interest and other income and expense, so a figure here can come in a little above or below a reported net income on the same business.
Above the $10M to $25M band the gross margin and overhead rows are a modeled extension of the same curves. They have not been reconciled against the licensed CFMA Benchmarker, so read those bands as a model and not as a survey result.
Problems acoustic ceiling contractors write to us about
Get on the list for the day it opens
30 days free, a 90-day money-back guarantee, and cancel anytime.
We email you when CFOS for QuickBooks opens, plus a few updates before then. Your address stays with Run On CFOS. One click unsubscribes.
30 days free, a 90-day money-back guarantee, and cancel anytime. It opens January 2027. We email you the day it opens.
What acoustic ceiling contractors ask
Can I bill grid and tile as separate lines?
Yes. Your schedule of values can have a grid line and a tile line for each floor or area. The pay app bills percent complete on each, with retainage, so grid can be billed as soon as it's in place.
How do I get paid for tile other trades pull and damage?
Code the replacement tile and labor to its own cost code so the cost is visible by job. When the GC directs the work, a T&M ticket goes on the daily and is signed on site. It becomes a change order draft for the next pay app.
Can I track a specialty ceiling apart from the standard grid?
Yes. Cost codes have three levels, so a wood or metal ceiling can have its own labor and material lines under the floor or area. Your estimate imports as the budget on those lines. Actual cost comes from QuickBooks Online every hour.
What about tile bought early and stored on site?
Where the contract allows it, the pay app can bill stored material on the schedule of values. The bill is coded to the job and checked against the PO. The WIP schedule then shows how much of the tile you're funding until it's billed.
Does CFOS replace QuickBooks Online for a ceiling contractor?
No. CFOS works on top of QuickBooks Online, which keeps your books. Your jobs, vendors and bills stay there, and Intuit bills QuickBooks Online separately.
- Job costing software that runs on QuickBooks
- One price. Every module. Priced by your revenue.
- Use all of it, or just the part you need
- Job costing software that runs on QuickBooks
- One price. Every module. Priced by your revenue.
- Use all of it, or just the part you need
- Acoustic ceiling benchmarks
QuickBooks is a trademark of Intuit Inc. Run On CFOS isn't affiliated with Intuit.