You inherit the slab and eat the shim labor
The slab is an inch and a half out of square, the concrete crew is gone and paid, and hiding it just became a framing expense.
Framing is where the design gets forced to match what got poured, because every trade after you sets to your lines. Drywall, mechanical, and finish trades inherit a structure that was already corrected, while you inherit the error itself and have to make it disappear. That correction work carries no cost code, no change order, and no witness left on site by the time you find it. Nobody downstream can see the day you spent pulling the plate line straight.
The size of it
A crew day per building on a 40-lot subdivision is 40 unbilled crew days, roughly $120K of labor absorbed as "that's just framing." It then gets baked into next year's square-foot number, which you can't defend when the builder pushes back on the increase.
You're the first trade on the structure, so you inherit whatever the concrete sub left behind: out-of-square slabs, mis-set anchor bolts, and stemwall elevations that miss the plan. By the time your first plate goes down, that sub has demobilized and been paid, so there's nobody left to backcharge. The GC won't open a change order against a sub who is off the schedule, and he won't stop the job to argue about it. So you shim, furr, re-drill for hold-downs, rope the plate line, and absorb the hours, usually a full crew day per building and sometimes more. Those hours post to your cost as ordinary framing labor with no note attached.
Three moves, in order
Step 04: Estimating system
The estimate maps one to one onto the job cost codes, so variance means something the day it appears.
What else costs framing contractors money
The same mechanism in other trades
What framing owners ask
Can i backcharge for an out of square slab as a framer?
The slab is an inch and a half out of square, the concrete crew is gone and paid, and hiding it just became a framing expense.
What does it cost?
A crew day per building on a 40-lot subdivision is 40 unbilled crew days, roughly $120K of labor absorbed as "that's just framing." It then gets baked into next year's square-foot number, which you can't defend when the builder pushes back on the increase.
What do I do first?
Walk the slab before the first plate goes down: pull diagonals, check anchor bolt locations and stemwall elevations, and photograph what's off with a tape in the frame that same day.
What are framing contractors supposed to be making?
Framing runs 18% gross margin, 13% overhead and 5% net profit before taxes at $1M–$5M. The all-trade average is 7%, so this trade sits 2 points below it. The CFOS target is 10%.
Which part of the system fixes it?
The step is number 04, estimating system. The estimate maps one to one onto the job cost codes, so variance means something the day it appears. It comes from chapter 4 of CONTROL: The Construction Financial Operating System.