CFOS for QuickBooks, coming January 2027See what you get
FRAMINGCFOS-04
FRAMING · ENVELOPE AND STRUCTURE · FIXED BY STEP 04

Nothing in your books turns hours back into square feet

You bid the plan by the square foot and pay the crew by the hour or by the unit, and nothing you own converts one into the other.

WHY IT'S A FRAMING PROBLEM

Almost no other trade bids in one unit and buys its biggest cost in another. A plumber bids fixtures and buys fixtures. An electrician bids devices and buys devices. Framing bids floor area and pays labor by the clock or by the piece. You have to build that conversion on purpose, or it doesn't exist.

WHAT IT COSTS

The size of it

A framer with 12 plans across two builders can have two or three losing plans for a full season and not know which. On $4M of labor-only volume, a 60-cent-per-square-foot blind spot on a third of the starts is about $125K of margin. It never turns up as one loss you can point to.

OVERHEAD AT $1M to $5M
13%
CFOS target 12% for framing.
GROSS MARGIN AT $1M to $5M
18%
CFOS target 22% for framing.
NET PROFIT AT $1M to $5M
5%
CFOS target 10% for framing.

Your largest cost line is priced in a unit your contract never uses. The contract says $6.40 per square foot of floor area on Plan 2340. Cost comes back as gross payroll plus burden by the week, or as a piece-rate check by unit. Nothing turns those dollars into square feet produced. So you can't tell anyone what a Plan 2340 cost you. When the builder asks for next season's number, you give him last year's, because it's the only one you have.

WHAT TO DO

Three moves, in order

STEP 01
Put the plan number and the floor square footage on every framing job in your cost file, so labor dollars post against a plan and a square foot count as well as a builder.
STEP 02
Take last week's payroll and piece-rate checks, divide by square feet framed on each plan, and write the real dollars per square foot next to the bid dollars per square foot on one sheet.
STEP 03
Take the three plans with the widest spread and reprice them before you sign the next schedule of values.
QUESTIONS

What framing owners ask

How do I know what a framing plan costs me per square foot?

You bid the plan by the square foot and pay the crew by the hour or by the unit, and nothing you own converts one into the other.

What does it cost?

A framer with 12 plans across two builders can have two or three losing plans for a full season and not know which. On $4M of labor-only volume, a 60-cent-per-square-foot blind spot on a third of the starts is about $125K of margin. It never turns up as one loss you can point to.

What do I do first?

Put the plan number and the floor square footage on every framing job in your cost file, so labor dollars post against a plan and a square foot count as well as a builder.

What are framing contractors supposed to be making?

Framing has 18% gross margin, 13% overhead and 5% net profit before taxes at $1M to $5M. The all-trade average is 7%, so this trade is 2 points below it. The CFOS target is 10%.

Which part of the system fixes it?

The step is number 04, estimating system. The estimate maps one to one onto the job cost codes, so variance means something the day it appears. It comes from chapter 4 of CONTROL: C.F.O.S. Construction Financial Operating System.

OR HAVE IT HANDLED

Everything on this page is something you can install yourself, and CONTROL is the order to do it in. If you would rather buy the finished result, SPM The Construction CFO does this work for framing contractors as a service. It is a separate firm, Sulphur Prairie Management, LLC, led by the same author.

What a fractional CFO does for framing contractors

AUTHOR
Josh Luebker
JOSH LUEBKER
MASTER ELECTRICIAN · 150+ PROJECTS · $2.1B+ MANAGED

Wrote CONTROL, the 8 step system behind these figures. More about the author.

Updated

8 Steps 60 Days

CONTROL is the full system, written for commercial subcontractors from $1M to $100M. It's out now. 8 steps, 6 working templates, and the order they install in. $9.99 ebook, $24.99 paperback.