Nothing in your books turns hours back into square feet
You bid the plan by the square foot and pay the crew by the hour or by the unit, and nothing you own converts one into the other.
Almost no other trade bids in one unit and buys its biggest cost in another. A plumber bids fixtures and buys fixtures. An electrician bids devices and buys devices. Framing bids floor area and pays labor by the clock or by the piece. You have to build that conversion on purpose, or it doesn't exist.
The size of it
A framer with 12 plans across two builders can have two or three losing plans for a full season and not know which. On $4M of labor-only volume, a 60-cent-per-square-foot blind spot on a third of the starts is about $125K of margin. It never turns up as one loss you can point to.
Your largest cost line is priced in a unit your contract never uses. The contract says $6.40 per square foot of floor area on Plan 2340. Cost comes back as gross payroll plus burden by the week, or as a piece-rate check by unit. Nothing turns those dollars into square feet produced. So you can't tell anyone what a Plan 2340 cost you. When the builder asks for next season's number, you give him last year's, because it's the only one you have.
Three moves, in order
Step 04: Estimating system
The estimate maps one to one onto the job cost codes, so variance means something the day it appears.
What else costs framing contractors money
The same mechanism in other trades
What framing owners ask
How do I know what a framing plan costs me per square foot?
You bid the plan by the square foot and pay the crew by the hour or by the unit, and nothing you own converts one into the other.
What does it cost?
A framer with 12 plans across two builders can have two or three losing plans for a full season and not know which. On $4M of labor-only volume, a 60-cent-per-square-foot blind spot on a third of the starts is about $125K of margin. It never turns up as one loss you can point to.
What do I do first?
Put the plan number and the floor square footage on every framing job in your cost file, so labor dollars post against a plan and a square foot count as well as a builder.
What are framing contractors supposed to be making?
Framing has 18% gross margin, 13% overhead and 5% net profit before taxes at $1M to $5M. The all-trade average is 7%, so this trade is 2 points below it. The CFOS target is 10%.
Which part of the system fixes it?
The step is number 04, estimating system. The estimate maps one to one onto the job cost codes, so variance means something the day it appears. It comes from chapter 4 of CONTROL: C.F.O.S. Construction Financial Operating System.
Everything on this page is something you can install yourself, and CONTROL is the order to do it in. If you would rather buy the finished result, SPM The Construction CFO does this work for framing contractors as a service. It is a separate firm, Sulphur Prairie Management, LLC, led by the same author.