Acceptance testing waits on everyone else's scope
Your final billing depends on an A17.1 acceptance test you can't schedule and can't pass alone, and a failure caused by the fire alarm contractor still costs you the re-inspection.
Other trades close out with a punch walk they control. You close out with a regulated test on a public calendar, and it waits on five systems other contractors own. So elevator final billing and retention come later than any schedule shows, and crew hours keep adding up after the work is physically done.
The size of it
Each failed test costs about a crew day, the fee, and two to four weeks of calendar. It also pushes back the certificate the CO depends on, so you take schedule blame for scope that was never yours.
A state, city, or QEI-certified inspector performs or witnesses the test on the jurisdiction's calendar. In a busy metro that queue is weeks out. The test only passes when other people's work is finished: Phase I recall and Phase II firefighters' service, sprinkler shunt trip, standby power transfer, permanent power, and two-way emergency communication. None of that is your scope, and all of it controls your test. When it fails you pay the fee, lose a full crew day, and take a new slot two to four weeks back in the queue. The certificate the CO depends on is issued against your work, so the delay comes back to you no matter who caused it.
Three moves, in order
Step 06: Project management
Billing dates, change orders, and notices, written as standards that work without anyone following up on them.
What else costs elevator contractors money
The same mechanism in other trades
What elevator owners ask
Elevator acceptance test failed because fire alarm wasn't finished?
Your final billing depends on an A17.1 acceptance test you can't schedule and can't pass alone, and a failure caused by the fire alarm contractor still costs you the re-inspection.
What does it cost?
Each failed test costs about a crew day, the fee, and two to four weeks of calendar. It also pushes back the certificate the CO depends on, so you take schedule blame for scope that was never yours.
What do I do first?
Write a test-readiness checklist covering recall, shunt trip, standby transfer, permanent power, and emergency communication, and make the GC sign it before you request an inspection date.
What are elevator contractors supposed to be making?
Elevator has 27% gross margin, 18% overhead and 9% net profit before taxes at $1M to $5M. The all-trade average is 7%, so this trade is 2 points above it. The CFOS target is 12.5%.
Which part of the system fixes it?
The step is number 06, project management. Billing dates, change orders, and notices, written as standards that work without anyone following up on them. It comes from chapter 6 of CONTROL: C.F.O.S. Construction Financial Operating System.
Everything on this page is something you can install yourself, and CONTROL is the order to do it in. If you would rather buy the finished result, SPM The Construction CFO does this work for elevator contractors as a service. It is a separate firm, Sulphur Prairie Management, LLC, led by the same author.