Where elevator contractors lose money
5 things cost elevator contractors money without ever becoming a line item, and each one traces to a step you can install. Elevator contractors average 27% gross margin, 18% overhead and 9% net profit at $1M to $5M of revenue. The CFOS target at that size is 29.5% gross margin, 17% overhead and 12.5% net, and the 3.5 points left on the table is where those mechanisms live. Figures for all 7 revenue bands are in the table below.
Elevator ranks 1st of 7 in mechanical and life safety on net profit, and it has heavier overhead than the 48-trade average. Here is every figure, across all 7 revenue bands.
Run On CFOS publishes the full benchmark reference: 48 trades across all 7 revenue bands, $1M to $500M and above. The 4 bands above $25M are modeled and labeled that way in every table. Each CFOS net profit target is set per trade and band: the higher of 10% and the trade's net profit average plus 3.5 points before taxes, and the book's 12% is the rule of thumb, not every trade's target. Run On CFOS computes net profit as gross margin minus overhead, before taxes.
Elevator by revenue band
| Metric | $1M to $5M | $5M to $10M | $10M to $25M | $25M to $50MModeled | $50M to $100MModeled | $100M to $500MModeled | $500M+Modeled | CFOS target at $1M to $5M |
|---|---|---|---|---|---|---|---|---|
| Overhead | 18% | 17% | 16% | 15% | 13% | 12% | 10% | 17% |
| Gross margin | 27% | 28% | 29% | 30% | 32% | 33% | 35% | 29.5% |
| Net profit | 9% | 11% | 13% | 15% | 19% | 21% | 25% | 12.5% |
| Metric | $1M to $5M | $5M to $10M | $10M to $25M | $25M to $50MModeled | $50M to $100MModeled | $100M to $500MModeled | $500M+Modeled |
|---|---|---|---|---|---|---|---|
| Overhead | 17% | 16% | 15% | 14% | 12% | 11% | 9% |
| Gross margin | 29.5% | 30.5% | 31.5% | 32.5% | 34.5% | 35.5% | 37.5% |
| Net profit | 12.5% | 14.5% | 16.5% | 18.5% | 22.5% | 24.5% | 28.5% |
Modeled extension of the survey curve, not reconciled against the licensed CFMA Benchmarker. That applies to the averages in the 4 bands above $10M to $25M. The CFOS net profit target in each band is the higher of 10% and the trade's net profit average plus 3.5 points before taxes, which puts Elevator at 12.5% at $1M to $5M and 28.5% at $500M+. The book's 12% is the rule of thumb across trades.
Gross margin and overhead come from figures CFMA, Jones Maresca and other sources publish by trade and size. Net profit is computed, not surveyed: net profit = gross margin minus overhead. Nothing comes out for taxes, interest or other income and expense, so it is a before tax figure, on the same basis as CFMA's net income before taxes.
CFMA's 2025 medians are 7.1 percent before interest and taxes and 6.7 percent net income before taxes. Gross margin minus overhead leaves out interest and other income and expense, so a figure here can come in a little above or below a reported net income on the same business.
Above the $10M to $25M band the gross margin and overhead rows are a modeled extension of the same curves. They have not been reconciled against the licensed CFMA Benchmarker, so read those bands as a model and not as a survey result.
Run On CFOS. Run On CFOS Trade Benchmark Reference: Elevator. 2026. Sulphur Prairie Operations, LLC. https://runoncfos.com/trades/elevator. CC BY 4.0.
Figures on this page were last revised 2026-08-21. Published under CC BY 4.0, which permits reuse of any figure here, including commercially, as long as the credit above travels with it. The same figures in machine-readable form: /benchmarks.json.
Trade level gross margin and overhead come from figures CFMA, Jones Maresca and other sources publish, and Run On CFOS computes net profit from them: net profit = gross margin minus overhead, before taxes. The CFOS targets beside them are from the book CONTROL: C.F.O.S. Construction Financial Operating System, published with the full reference at runoncfos.com.
- 2024 Construction Financial Benchmarker, Executive Summary, Construction Financial Management Association, 2024.
- 2025 Construction Financial Benchmarker, Executive Summary, Construction Financial Management Association, 2025.
- 2025 Performance Benchmarks, Construction Companies, Jones Maresca and Company, 2025.
- Run On CFOS Trade Benchmark Reference, Sulphur Prairie Operations, LLC, 2026.
Sourcing and method: the methodology page.
Which bands are measured. The 4 bands above $10M to $25M extend the survey curve further out and have not been reconciled against the licensed CFMA Benchmarker. How every figure was built is explained on the methodology page.
Use these numbers on your own jobs
CFOS for QuickBooks grades your own books against the elevator figures above, every month. At $1M to $5M, the published average net profit is 9% before taxes and the CFOS target is 12.5%.
Under $10M. You see which jobs made money while they are still open, so you can fix a elevator job before it closes. From $10M to $50M. The controller gets a WIP that ties to QuickBooks Online, with each project manager's cost to complete approved every month.
5 problems specific to elevator
The controller and machine are set, the entrances are eight weeks out, and there's nothing on the pay application because a car with four of five components doesn't operate. Six weeks of architect and GC review get added on top of your lead time. Your final billing depends on an A17.1 acceptance test you can't schedule and can't pass alone, and a failure caused by the fire alarm contractor still costs you the re-inspection. The stainless cab and #4 entrances got priced on bid day and bought half a year later, and the lump sum contract has no escalation language in it.
Each one below points at the item, the unit, the clock, or the party that makes it an elevator problem, and it says which step fixes it.
| Mechanism | Why it's specific to this trade | Step |
|---|---|---|
| Five lead times apply to one car, and none of it is billable | A distributor trade swaps a stock item and keeps working. Elevator equipment is built to travel, stop count, and opening arrangement. No shelf in the country has a substitute part for your hoistway. So the longest of five vendor clocks sets the schedule for the whole car, and percent complete is fiction until the last crate comes off the truck. | Job cost structure |
| Your elevator doesn't get built until layouts come back | Most subs measure lead time from the day they place the order. Yours starts the day an architect signs. The party holding your schedule has no money at risk in it. Two approvals, from two different parties, come before one manufacturing clock that can't start early. | Project management |
| Acceptance testing waits on everyone else's scope | Other trades close out with a punch walk they control. You close out with a regulated test on a public calendar, and it waits on five systems other contractors own. So elevator final billing and retention come later than any schedule shows, and crew hours keep adding up after the work is physically done. | Project management |
| You bid steel in March and buy it in September | A trade that buys commodity material every week reprices on the next job. You commit a metals-heavy number once, wait two quarters, then buy equipment you can't value engineer after the layout is stamped. The months between bid day and release day are the whole risk, and that wait is part of how elevator work gets procured. | Estimating system |
| Warranty year reduces the margin you already billed | Most trades stop spending on a job the day they leave the site. You keep spending for a year on a car that has to keep working for the same owner who holds your retention. The first money leaves at month three. The last money comes in at month twenty-six. Twelve months of service fall in between, and almost no other subcontractor has that cycle. | Job cost structure |
Elevator against the other 47 trades
| Metric | Elevator | Mechanical and life safety average | All 48 average | Rank |
|---|---|---|---|---|
| Overhead | 18% | 16.1% | 15.1% | 46th of 48 |
| Gross margin | 27% | 24.6% | 22.1% | 1st of 48 |
| Net profit | 9% | 8.4% | 7% | 2nd of 48 |
Elevator sheds 8 points of overhead between $1M to $5M and $500M+, against 6.3 for mechanical and life safety as a group. Inside that group, Mechanical, Plumbing and Elevator all keep 9%, the most in the group, and Fire protection has the leanest overhead at 15%. The first of those is this trade.
Other mechanical and life safety trades
What owners ask
What overhead should an elevator contractor have?
Elevator shares its overhead figure with 2 other trades at this revenue, which is what the published data resolves to. It averages 18% at $1M to $5M and 10% at $500M+, as a percentage of revenue. That is 1.9 points above the mechanical and life safety average of 16.1%. The CFOS target at $1M to $5M is 17%. The CFOS target is one point leaner than your trade's industry average at your revenue.
What gross margin should an elevator contractor have?
Elevator shares its gross margin figure with 1 other trade at this revenue, which is what the published data resolves to. It averages 27% at $1M to $5M and 35% at $500M+, as a percentage of revenue. That is 2.4 points above the mechanical and life safety average of 24.6%. The CFOS target at $1M to $5M is 29.5%. The CFOS target recalculates at your revenue: the net profit target plus the overhead target, so the three targets tie.
What net profit should an elevator contractor have?
Elevator shares its net profit figure with 5 other trades at this revenue, which is what the published data resolves to. It averages 9% at $1M to $5M and 25% at $500M+, before taxes, gross margin minus overhead, as a percentage of revenue. That is 0.6 points above the mechanical and life safety average of 8.4%. The CFOS target at $1M to $5M is 12.5%. The CFOS target recalculates at your revenue: 10 percent before taxes, or 3.5 points better than your trade's industry average, whichever is higher. It's a target, not an average.
What profit margin should a small elevator business have?
Owners usually mean net profit when they say profit margin, and for elevator at $1M to $5M that's 9%. Gross margin is a different number, 27%, and it's what's left after job costs but before overhead. Overhead is the 18% between the two. A small elevator business holding 9% net is at the published figure for its size, and the CFOS target at that revenue is 12.5%.
Does elevator get more profitable as it grows?
Overhead is the number that moves. Elevator sheds 8 points between $1M to $5M and $500M+, which is steeper than the 6.3 points mechanical and life safety sheds as a group. Net profit is already above the 48-trade average, so the room is in holding it while revenue rises.
Where does elevator rank against the other trades?
Elevator ties 2 trades in mechanical and life safety on net profit, all at 9%. Nothing publishes more, and Mechanical and Plumbing match it. Fire protection has the leanest overhead at 15%. Gross margin ranks 1st of 48 and overhead ranks 46th.
The average and the target, in dollars a year
Put in your annual revenue. This shows the elevator industry average and the CFOS target at your revenue for gross margin, overhead and net profit, in dollars a year. Nothing you type leaves the page.
Your figures show here once revenue is in.
An industry average is the middle of the pack: about half of companies do worse. About 6 in 10 construction businesses close within 10 years (U.S. Bureau of Labor Statistics, Business Employment Dynamics: about 40% of construction establishments opened in 2013, still operating in 2023). The business in the middle is one of the ones that close. On those numbers, average is a business that closes within 10 years. That's why the CFOS target is a requirement.
The order to reach the target is the book's: find your numbers, then the job costing that keeps them current, CFOS for elevator.
That's the industry average and the CFOS target for elevator at every size. Want your own books set beside them? The Financial Health Snapshot builds a CEO Report from your last twelve months, sets every figure against your trade, and walks you through it on a 60 minute call. SPM The Construction CFO (Sulphur Prairie Management, LLC) is a separate firm, and the same author leads it.
Everything on this page is something you can install yourself, and CONTROL is the order to do it in. If you would rather buy the finished result, SPM The Construction CFO does this work for elevator contractors as a service. It is a separate firm, Sulphur Prairie Management, LLC, led by the same author.