CFOS for QuickBooks, coming January 2027See what you get
CFOSPROCESS PIPING
CFOS FOR QUICKBOOKS · PROCESS PIPING

Job costing software for process piping contractors

Process piping is welded, spooled and tested inside a working plant, often on T&M or cost-plus. CFOS for QuickBooks costs shop spools, field welds, testing and shutdown hours to each job.

Every Monday we email the list what we built that week, with screenshots or a short video, and we email you the day it opens. Your address stays with Run On CFOS. One click unsubscribes.

Early access offer: everyone on this list before CFOS for QuickBooks opens gets 12 months with no subscription fee, counted from the day it opens in January 2027. During those 12 months the only charge is AI use, billed every Monday at what it costs us plus 10 percent for the work of billing it. Pay by bank transfer (ACH) and that is the whole charge, and pay by card and 3 percent is added for the card fee. After the 12 months the regular monthly price for your size starts, and you can cancel anytime before then with nothing owed but the AI you used.

30 days free, a 90-day money-back guarantee, and cancel anytime. It opens January 2027. We email you every Monday with what we built, and the day it opens.

How process piping bills and where the money leaks

Process piping for food plants, chemical plants, refineries and water treatment bills in a few ways. Capital projects bill progress on a schedule of values or by unit rates for welds, footage and supports. Plant maintenance and shutdown work bill on T&M or cost-plus against rate sheets the owner approved, with daily tickets signed by the owner's rep.

On T&M work the leak is the ticket that isn't signed. A shutdown packs a lot of hours into a short window, with overtime, night shift and extra crews, and every hour has to be on a signed ticket with the right rate class. An hour worked and never billed is an hour of wages with no revenue against it.

On lump sum work the leak is everything around the weld. Plant safety orientation, badging, permits to work, waiting on a line to be cleared and under lockout, and standby for the owner's operators all take time the takeoff didn't count. Weld repairs found by X-ray, hydrotest failures and material that fails traceability bring the crew back to the same spool.

How process piping costs split and what CFOS tracks

Process piping costs split into shop fabrication, field erection, welding, supports, valves and specialty material, testing and NDE, equipment, and travel and per diem. Material can be carbon steel, stainless or alloy, and the owner sometimes furnishes it, which changes what belongs in your cost at all. Labor is the biggest share, and shop hours and field hours produce at different rates.

CFOS imports your estimate as the job budget by cost code and compares it to actual cost from QuickBooks Online every hour. Seven cost types and three levels of cost code let you budget by area or line, then by shop, field and testing. Field and shop time comes in approved, with labor burden set by class, so a certified welder and a helper each cost what they really cost.

Bills emailed to your bills inbox are read, coded to the job and checked against the PO. Alloy fittings and valves are expensive enough that one bill on the wrong job throws off two margins. Equipment daily rates charge welding rigs, lifts and the crane to the job on the days they're on a daily.

Workflow from the field to the office

The foreman files a daily with the crew, the equipment and photos. On T&M and shutdown work the ticket goes on the daily, with hours by rate class, and the owner's rep or GC signs it on site. It becomes a change order draft, so extra scope on a lump sum job gets billed and T&M hours make it to the invoice.

Shop time on spools is entered by job and cost code, so fabrication is charged to the job it's built for and not to overhead. Field time is approved and goes to QuickBooks Payroll. Per diem and lodging bills are coded to the job on their own line, so a traveling crew's cost is in the job and not in the office.

The PM builds the pay app from the schedule of values, with retainage and stored materials where the contract allows. RFIs, submittals and punch items are tracked on the job. When turnover waits on a hydrotest or a weld repair, the open punch items tell you which line is still open.

What the owner sees every month

Each month the PM enters cost to complete on every open job and it gets approved. The WIP schedule shows over and under billing, which tells you whether spools in the shop are funded by the owner or by your credit line. The master WIP puts every job on one page, T&M and lump sum together.

Your CEO Report grades gross margin, overhead and net profit before taxes against the published average and CFOS target for process piping at your size. On T&M work, gross margin depends on rate sheets priced with your real burden. Comparing job cost to billed hours tells you which rate classes are priced too low.

The 13 week cash forecast reads your QuickBooks Online data and your pay apps and marks the lowest week. Plant owners often pay on long terms, and a shutdown means a big payroll before the first invoice is paid. Seeing that week early lets you plan a draw on the credit line instead of scrambling for one.

COST CODES

Process piping cost codes, matched to QuickBooks

Each group below is one set of cost codes in CFOS. Bills, time and equipment post to them. QuickBooks keeps the books underneath, so your bookkeeper sees the same numbers.

Cost code groupWhat goes on it
Shop fabricationSpool cutting, fitting and welding in the shop, charged to the job it's for.
Field erectionSetting spools, field fit-up and bolt-up at flanges.
Field weldingField welds by size and material, including certified welders' time.
Pipe and fittingsCarbon, stainless and alloy pipe and fittings, with mill certs.
Valves and specialty itemsValves, strainers, traps and specialty items your crew installs.
Pipe supportsShoes, guides, hangers and support steel.
Testing and NDEHydrotests, pneumatic tests, X-ray and other NDE, and weld repairs.
Plant access and safetyOrientation, badging, permits to work, lockout waits and standby.
Travel and per diemPer diem, lodging and travel for crews working away from home.
T&M and change ordersShutdown and extra work by rate class, tied to the signed ticket.
THE NUMBERS FOR PROCESS PIPING

How process piping contractors do, by revenue

Each row shows the all-trade average, this trade's average and the CFOS target. These are the numbers your own job costing gets graded against. Net profit is before taxes in every row.

RevenueOverheadGross marginNet profit, before taxes
$1M to $5M15.1% all-trade average
16% Process piping
14.1% CFOS target
22.1% all-trade average
24% Process piping
25% CFOS target
7% all-trade average
8% Process piping
11% CFOS target
$5M to $10M14.1% all-trade average
15% Process piping
13.1% CFOS target
23.4% all-trade average
25% Process piping
26% CFOS target
9.4% all-trade average
10% Process piping
12.9% CFOS target
$10M to $25M13.1% all-trade average
14% Process piping
12.1% CFOS target
24.6% all-trade average
26% Process piping
27.1% CFOS target
11.5% all-trade average
12% Process piping
15% CFOS target
$25M to $50M12.1% all-trade average
13% Process piping
11.1% CFOS target
25.7% all-trade average
27% Process piping
28.2% CFOS target
13.7% all-trade average
14% Process piping
17.2% CFOS target
HOW THE NET PROFIT FIGURES ARE BUILT.

Gross margin and overhead come from figures CFMA, Jones Maresca and other sources publish by trade and size. Net profit is computed, not surveyed: net profit = gross margin minus overhead. Nothing comes out for taxes, interest or other income and expense, so it is a before tax figure, on the same basis as CFMA's net income before taxes.

CFMA's 2025 medians are 7.1 percent before interest and taxes and 6.7 percent net income before taxes. Gross margin minus overhead leaves out interest and other income and expense, so a figure here can come in a little above or below a reported net income on the same business.

Above the $10M to $25M band the gross margin and overhead rows are a modeled extension of the same curves. They have not been reconciled against the licensed CFMA Benchmarker, so read those bands as a model and not as a survey result.

See every figure for process piping.

90-DAY MONEY-BACK · CANCEL ANYTIME

Get on the list for the day it opens

30 days free, a 90-day money-back guarantee, and cancel anytime.

Every Monday we email the list what we built that week, with screenshots or a short video, and we email you the day it opens. Your address stays with Run On CFOS. One click unsubscribes.

Early access offer: everyone on this list before CFOS for QuickBooks opens gets 12 months with no subscription fee, counted from the day it opens in January 2027. During those 12 months the only charge is AI use, billed every Monday at what it costs us plus 10 percent for the work of billing it. Pay by bank transfer (ACH) and that is the whole charge, and pay by card and 3 percent is added for the card fee. After the 12 months the regular monthly price for your size starts, and you can cancel anytime before then with nothing owed but the AI you used.

30 days free, a 90-day money-back guarantee, and cancel anytime. It opens January 2027. We email you every Monday with what we built, and the day it opens.

QUESTIONS

What process piping contractors ask

Can CFOS handle T&M and cost-plus work with owner rate sheets?

Yes. T&M rate sheets, wage classes and overtime are set up in advance, so every ticket is priced the same way. The ticket goes on the foreman's daily and is signed on site. It then becomes a change order draft for billing.

Can spool fabrication in my shop go on the job?

Yes. Shop time is entered by job and cost code, so spools are charged to the job they're built for. That keeps fabrication out of overhead. It also lets you compare shop hours to field hours on each line.

What about material the plant owner furnishes?

Leave owner-furnished material out of your budget and budget the labor to receive and install it. Your job cost then reflects what you spent. The margin compares to what you bid.

How do I see what a shutdown cost?

Set the shutdown up as its own job or as its own cost codes on the plant's job. Approved time, equipment daily rates and bills post to it as the work happens. When it's over, you compare actual cost to what you billed.

Does CFOS replace QuickBooks Online for a piping contractor?

No. CFOS works on top of QuickBooks Online and reads from and writes to it. QuickBooks keeps your books, and you still pay Intuit for it separately.

Updated

8 Steps 60 Days

CONTROL is the full system, written for commercial subcontractors from $1M to $100M. It's out now. 8 steps, 6 working templates, and the order they install in. $9.99 ebook, $24.99 paperback.