CFOS for QuickBooks, coming January 2027See what you get
CFOSIRRIGATION
CFOS FOR QUICKBOOKS · IRRIGATION

Job costing software for irrigation contractors

Irrigation goes in over several trips: sleeves before paving, then mainline and zones, then years of service. CFOS for QuickBooks costs each trip, part and service call to the job. You see which installs and service accounts make money.

Every Monday we email the list what we built that week, with screenshots or a short video, and we email you the day it opens. Your address stays with Run On CFOS. One click unsubscribes.

Early access offer: everyone on this list before CFOS for QuickBooks opens gets 12 months with no subscription fee, counted from the day it opens in January 2027. During those 12 months the only charge is AI use, billed every Monday at what it costs us plus 10 percent for the work of billing it. Pay by bank transfer (ACH) and that is the whole charge, and pay by card and 3 percent is added for the card fee. After the 12 months the regular monthly price for your size starts, and you can cancel anytime before then with nothing owed but the AI you used.

30 days free, a 90-day money-back guarantee, and cancel anytime. It opens January 2027. We email you every Monday with what we built, and the day it opens.

How irrigation bills and where the money leaks

Commercial irrigation usually bills on a schedule of values with a monthly pay app and retainage. Lines often follow the phases: sleeves, the tap and backflow preventer, mainline, valves and zones, the controller, and testing and as-builts. Service work is separate, with spring startups, winterizations and repairs billed per visit or on a seasonal contract.

The leaks come from the trips. Sleeves go in under the paving months before anything else, and the bid often priced one mobilization for a job that takes four. Other trades cut lines and damage heads after you've tested a zone, and without a signed ticket the repair is on you.

Approvals and power are the rest. A backflow test or a water meter waits on the city, and the controller waits on an electrician. Coverage adjustments after the plants go in add trips that weren't in the bid, and retainage waits on the whole site, so the last check comes long after the last head was set.

How irrigation costs split and what CFOS tracks

An irrigation job spends on pipe and fittings, sleeves, valves, heads and drip, wire, controllers and sensors, backflow preventers and meters, trenching and pulling equipment, and crew labor. Material comes in many small drops from a supply house. Labor is spread across trips that can be months apart.

CFOS reads your jobs, cost codes and vendors from QuickBooks Online and compares actual cost to your estimate by cost code, updated every hour. Supply house bills emailed to your bills inbox are read, coded to the job and checked against the PO. A box of rotors picked up for one job doesn't end up on another.

Trenchers, vibratory plows and trucks get an equipment daily rate built from what they cost you to own, charged to the job on each day they're on a daily. If you set up sleeves, mainline, zones, controller and startup as separate cost codes, each phase has its own budget and actual. You see which trip went over.

Workflow from the field to the office

The crew lead's daily lists the crew, the equipment and photos of open trenches, sleeve locations and finished zones. Field time is approved and goes to QuickBooks Payroll, coded to the phase. Those photos also give you a record of where the sleeves and mainline went.

When another trade cuts a lateral, the GC moves a bed or the city requires a different backflow assembly, a T&M ticket goes on the daily. The GC signs it on site and it becomes a change order draft for the next pay app. The change orders page shows how numbers and revisions are kept.

Installs bill from the schedule of values, and CFOS lays out the G702 and G703 with retainage. Service accounts can be their own jobs, with startups, winterizations and repairs coded so each visit is counted. Pay app due dates send reminders to the PM, so a small monthly bill isn't forgotten.

What the owner sees every month

Each month the PM enters cost to complete on every open install, including the startup and the coverage walk still to come, and you approve it. The WIP schedule shows over and under billing by job. A job that billed sleeves and mainline early shows how much of the work is still ahead.

The CEO Report grades your gross margin, overhead and net profit before taxes against the published average for irrigation and the CFOS target for your size. It tells you if your install and service work together make the margin you bid. The 13 week cash forecast reads your QuickBooks and pay apps and marks the lowest week, which helps in spring when supply house bills and startup payroll come before the checks.

AR aging and a collections list flag the small service invoices and held retainage that tend to age. You can ask Claude or ChatGPT about your own jobs, such as which service accounts cost more than they billed last season. It reads your numbers and can't change them.

COST CODES

Irrigation cost codes, matched to QuickBooks

Each group below is one set of cost codes in CFOS. Bills, time and equipment post to them. QuickBooks keeps the books underneath, so your bookkeeper sees the same numbers.

Cost code groupWhat goes on it
SleevesSleeves under paving and walks, the trip to install them, and marking their locations.
Tap and backflowTap, meter, backflow preventer, enclosure and the certified test.
MainlineMainline pipe, fittings, isolation valves, thrust blocks and trenching.
Valves and zonesZone valves, valve boxes, lateral pipe, wire and splices.
Heads and dripSpray heads, rotors, nozzles, drip line and emitters by zone.
Controller and sensorsControllers, rain and flow sensors, wiring and programming.
Trenching and equipmentTrenchers, vibratory plows and trucks at their daily rates.
Testing, startup and as-builtsPressure testing, coverage adjustments, startup and as-built drawings.
Damage repairCut laterals, damaged heads and cut wire after other trades, tied to a signed T&M ticket.
Seasonal serviceSpring startups, winterizations, repairs and service visits on maintenance accounts.
THE NUMBERS FOR IRRIGATION

How irrigation contractors do, by revenue

Each row shows the all-trade average, this trade's average and the CFOS target. These are the numbers your own job costing gets graded against. Net profit is before taxes in every row.

RevenueOverheadGross marginNet profit, before taxes
$1M to $5M15.1% all-trade average
15% Irrigation
14.1% CFOS target
22.1% all-trade average
22% Irrigation
25% CFOS target
7% all-trade average
7% Irrigation
11% CFOS target
$5M to $10M14.1% all-trade average
14% Irrigation
13.1% CFOS target
23.4% all-trade average
23% Irrigation
26% CFOS target
9.4% all-trade average
9% Irrigation
12.9% CFOS target
$10M to $25M13.1% all-trade average
13% Irrigation
12.1% CFOS target
24.6% all-trade average
24% Irrigation
27.1% CFOS target
11.5% all-trade average
11% Irrigation
15% CFOS target
$25M to $50M12.1% all-trade average
12% Irrigation
11.1% CFOS target
25.7% all-trade average
25% Irrigation
28.2% CFOS target
13.7% all-trade average
13% Irrigation
17.2% CFOS target
HOW THE NET PROFIT FIGURES ARE BUILT.

Gross margin and overhead come from figures CFMA, Jones Maresca and other sources publish by trade and size. Net profit is computed, not surveyed: net profit = gross margin minus overhead. Nothing comes out for taxes, interest or other income and expense, so it is a before tax figure, on the same basis as CFMA's net income before taxes.

CFMA's 2025 medians are 7.1 percent before interest and taxes and 6.7 percent net income before taxes. Gross margin minus overhead leaves out interest and other income and expense, so a figure here can come in a little above or below a reported net income on the same business.

Above the $10M to $25M band the gross margin and overhead rows are a modeled extension of the same curves. They have not been reconciled against the licensed CFMA Benchmarker, so read those bands as a model and not as a survey result.

See every figure for irrigation.

90-DAY MONEY-BACK · CANCEL ANYTIME

Get on the list for the day it opens

30 days free, a 90-day money-back guarantee, and cancel anytime.

Every Monday we email the list what we built that week, with screenshots or a short video, and we email you the day it opens. Your address stays with Run On CFOS. One click unsubscribes.

Early access offer: everyone on this list before CFOS for QuickBooks opens gets 12 months with no subscription fee, counted from the day it opens in January 2027. During those 12 months the only charge is AI use, billed every Monday at what it costs us plus 10 percent for the work of billing it. Pay by bank transfer (ACH) and that is the whole charge, and pay by card and 3 percent is added for the card fee. After the 12 months the regular monthly price for your size starts, and you can cancel anytime before then with nothing owed but the AI you used.

30 days free, a 90-day money-back guarantee, and cancel anytime. It opens January 2027. We email you every Monday with what we built, and the day it opens.

QUESTIONS

What irrigation contractors ask

How do I cost sleeves installed months before the rest of the job?

Set up sleeves as their own cost code with their own budget. The crew's time and the equipment on that day's daily post to it, and the pay app bills it as its own line. When the rest of the job starts, you already know what the sleeve trip cost.

Can I get paid for lines another trade cut?

Put the repair on the daily as a T&M ticket with photos, and have the GC sign it on site. It becomes a change order draft for the next pay app. If it can't be billed, the cost still goes on its own code so you see it.

How do I track winterizations and startups?

Set up service accounts as jobs with cost codes for startup, winterization and repairs. Each visit has a daily with the crew and truck. You compare what each account cost to what it billed.

Does CFOS track retainage until the whole site is accepted?

Yes. Retainage is tracked on every pay app, and the 13 week cash forecast reads from them. You see what's held on each job and plan around it.

Does CFOS replace QuickBooks Online for my irrigation company?

No. QuickBooks Online keeps your books, and CFOS works on top of it. It reads and writes jobs, cost codes, vendors, bills and invoices, so there's no migration.

Updated

8 Steps 60 Days

CONTROL is the full system, written for commercial subcontractors from $1M to $100M. It's out now. 8 steps, 6 working templates, and the order they install in. $9.99 ebook, $24.99 paperback.