One Install Line, Five Trips to the Same Building

Base cabinets go in first, tops follow, doors and hardware wait on paint, and touch-up closes it out. You priced one install and you're making four or five trips.

WHY IT'S A MILLWORK AND CASEWORK PROBLEM

Most trades come in, install, and leave the building for good. Millwork installs last, into a jobsite that's still active, and its product is the visible finished surface every remaining trade walks past with a ladder. That makes every scratch, ding, and misaligned door a millwork punch item whether or not your crew ever touched it.

WHAT IT COSTS

The size of it

Mobilization cost multiplies across four or five trips that were priced as one line. Damage from following trades comes back on your punch list, and scribes, fillers, and field rework from dimensions that were never verified turn into unbilled field hours.

OVERHEAD AT $1M–$5M
13%
Derived from Interiors, the nearest comparable trade. CFOS target 12%.
GROSS MARGIN AT $1M–$5M
19%
Derived from Interiors, the nearest comparable trade. CFOS target 22%.
NET PROFIT AT $1M–$5M
6%
Derived from Interiors, the nearest comparable trade. CFOS target 10%.

The install splits into several separate events. Base cabinets go in first, countertops can't be templated until the cabinets are set and stable, and stone runs another 2 to 3 weeks after template. Doors and hardware wait on paint, wall panels follow those, and then hardware adjustment and touch-up close it out. Each trip is its own mobilization with its own crew, truck, and lift. Field measure can't happen until wall backing, ceilings, and floor finishes are physically in place, so your ability to cut to size is gated by the GC's substrate readiness.

WHAT TO DO

Three moves, in order

STEP 01
Bid installation as separate mobilizations with a written trigger for each one: cabinets set, stone templated, paint complete, and punch. Put a price on every trip.
STEP 02
Make field measure a scheduled event with a signature: backing, ceilings, and floor finish in place, walked with the superintendent, and dated.
STEP 03
Photograph every elevation the day your crew finishes it, so damage discovered three trades later has a date attached to it.
QUESTIONS

What millwork and casework owners ask

How to bid millwork installation when it takes four separate trips?

Base cabinets go in first, tops follow, doors and hardware wait on paint, and touch-up closes it out. You priced one install and you're making four or five trips.

What does it cost?

Mobilization cost multiplies across four or five trips that were priced as one line. Damage from following trades comes back on your punch list, and scribes, fillers, and field rework from dimensions that were never verified turn into unbilled field hours.

What do I do first?

Bid installation as separate mobilizations with a written trigger for each one: cabinets set, stone templated, paint complete, and punch. Put a price on every trip.

What are millwork and casework contractors supposed to be making?

No survey separates millwork and casework, so there is no figure of its own. The nearest comparable trade in the reference is Interiors, which runs 19% gross margin, 13% overhead and 6% net profit before taxes at $1M–$5M, with a CFOS target of 10% net. Those are derived figures, not millwork and casework's own. Read them as the neighbourhood, and read your own job costing as the answer.

Which part of the system fixes it?

The step is number 06, project management. Billing dates, change orders, and notices, written as standards that work without anyone chasing them. It comes from chapter 6 of CONTROL: The Construction Financial Operating System.

OR HAVE IT HANDLED

Everything on this page is something you can install yourself, andCONTROL is the order to do it in. If you would rather buy the finished result, SPM The Construction CFO does this work for millwork and casework contractors as a service. It is a separate firm, Sulphur Prairie Management, LLC, run by the same author.

What SPM The Construction CFO does, and what it costs

AUTHOR
Josh Luebker
JOSH LUEBKER
MASTER ELECTRICIAN · 150+ PROJECTS · $2.1B+ MANAGED

Wrote CONTROL, the 8 step system behind these figures. More about the author.

8 Steps 60 Days

CONTROL is the full system, written for commercial subcontractors from under $1M to $100M. It's out now. 8 steps, 6 working templates, and the order they install in. $9.99 ebook, $24.99 paperback.