Three Spec Lines That Cost You Before You Bid
The spec called for QCP certification, Premium grade where you priced Custom, and hardware marked NIC. All three are direct cost and none came with revenue.
Other trades pick up their specification cost off the drawings, where an estimator is already looking. Millwork picks it up in Division 06 text: a certification program, a grade designation, and a three-letter note beside a hardware schedule. None of those has a quantity to take off, so they go missing in the shops that are best at counting sheets.
The size of it
A shop that missed QCP on a 1.5 million dollar woodwork package paid out 7,500 plus a licensee fee before it cut anything. A missed NIC hardware note is worth considerably more than that, and neither one comes with a change order.
Three lines in a woodwork specification hold real money and are easy to read straight past. When the AWI Quality Certification Program is specified, the project fee is 0.5 percent of the woodwork contract value or 500 dollars, whichever is greater, capped at 10,000, and becoming a licensee costs 2,000 for AWI members or 3,500 for non-members. Grade drives cost directly: Premium scribe tolerance is 1/32 inch against 1/16 inch for Custom, and calling Premium across the whole package adds 20 to 30 percent. Hardware written NIC comes back to you and can run 15 to 25 percent on top of base fabrication.
Three moves, in order
Step 04: Estimating system
The estimate maps one to one onto the job cost codes, so variance means something the day it appears.
What else costs millwork and casework contractors money
The same mechanism in other trades
What millwork and casework owners ask
AWI QCP certification fee cost and how to include it in a woodwork bid?
The spec called for QCP certification, Premium grade where you priced Custom, and hardware marked NIC. All three are direct cost and none came with revenue.
What does it cost?
A shop that missed QCP on a 1.5 million dollar woodwork package paid out 7,500 plus a licensee fee before it cut anything. A missed NIC hardware note is worth considerably more than that, and neither one comes with a change order.
What do I do first?
Add a spec read to the bid checklist that answers three questions in writing before the number goes out: QCP or no QCP, what grade by area, and who buys the hardware.
What are millwork and casework contractors supposed to be making?
No survey separates millwork and casework, so there is no figure of its own. The nearest comparable trade in the reference is Interiors, which runs 19% gross margin, 13% overhead and 6% net profit before taxes at $1M–$5M, with a CFOS target of 10% net. Those are derived figures, not millwork and casework's own. Read them as the neighbourhood, and read your own job costing as the answer.
Which part of the system fixes it?
The step is number 04, estimating system. The estimate maps one to one onto the job cost codes, so variance means something the day it appears. It comes from chapter 4 of CONTROL: The Construction Financial Operating System.
Everything on this page is something you can install yourself, andCONTROL is the order to do it in. If you would rather buy the finished result, SPM The Construction CFO does this work for millwork and casework contractors as a service. It is a separate firm, Sulphur Prairie Management, LLC, run by the same author.