Who should set up the chart of accounts and cost codes?
Two structures decide what every report can say, and they often get set up by whoever has the software open.
The chart of accounts is the profit and loss statement at the business level, and the CFO or the controller sets it up. Job cost codes are the profit and loss statement at the project level, and the CFO and the COO choose them, aligned with the business strategy and the work the company performs. The software implementor, the bookkeeper and the CPA don't choose the job cost codes. Once the codes are chosen, the controller and the implementor enter them into the accounting software. Then the COO and estimating align the codes with the estimate, so every kind of cost has a code: material, subcontractor, equipment, tool, labor and direct job expense.
Three moves, in order
What CFOS does about it
CFOS uses three levels of cost code, and you see them on every job, matched to the estimate. Estimates come in as the budget by cost code, so job cost can be compared to the bid. It reads from QuickBooks Online, which keeps the books and the chart of accounts. The owner or CFO still picks the codes, and the estimator and operations make sure they fit the work.
Who owns this: Owner or CFO, with operations and estimating.
At $2M, one person often sets up the chart of accounts and the codes the same afternoon. Write down the kinds of cost you want to see on every job first. Then ask the estimator if the codes match the way the estimate is built.
Every Monday we email the list what we built that week, with screenshots or a short video, and we email you the day it opens. Your address stays with Run On CFOS. One click unsubscribes.
Early access offer: everyone on this list before CFOS for QuickBooks opens gets 12 months with no subscription fee, counted from the day it opens in January 2027. During those 12 months the only charge is AI use, billed every Monday at what it costs us plus 10 percent for the work of billing it. Pay by bank transfer (ACH) and that is the whole charge, and pay by card and 3 percent is added for the card fee. After the 12 months the regular monthly price for your size starts, and you can cancel anytime before then with nothing owed but the AI you used.
30 days free, a 90-day money-back guarantee, and cancel anytime. It opens January 2027. We email you every Monday with what we built, and the day it opens.
Step 01: Job cost structure
Seven cost categories and three levels of granularity, built so the estimate and the ledger use the same words.
Other problems step 01 solves
Other things that go wrong
What owners ask
Who creates construction chart of accounts job cost structure?
Two structures decide what every report can say, and they often get set up by whoever has the software open. The chart of accounts is the profit and loss statement at the business level, and the CFO or the controller sets it up. Job cost codes are the profit and loss statement at the project level, and the CFO and the COO choose them, aligned with the business strategy and the work the company performs. The software implementor, the bookkeeper and the CPA don't choose the job cost codes. Once the codes are chosen, the controller and the implementor enter them into the accounting software. Then the COO and estimating align the codes with the estimate, so every kind of cost has a code: material, subcontractor, equipment, tool, labor and direct job expense.
Which part of the system fixes this?
The step is number 01, job cost structure. Seven cost categories and three levels of granularity, built so the estimate and the ledger use the same words. It's drawn from chapter 1 of CONTROL: C.F.O.S. Construction Financial Operating System.
Is this normal for my trade?
Across the 48 trades that publish a figure, net profit at $1M to $5M averages 7% before taxes. If you're well under that and this page describes your month, the two are usually the same story. The published average tells you where the pack is, and your own job costing tells you where you are, which is the number that pays payroll.
Where do I start?
Have the CFO or the controller set up the chart of accounts for the business level profit and loss statement.
Is this where an installation usually starts?
It usually is. Step 01 has nothing ahead of it in the chain, and it supplies step 03 and step 04. That's why most installations begin here, and why fixing this one unblocks work you haven't started yet.
