A Hairline Crack Costs You a Whole Elevation

It's a hairline off a window corner and the industry calls that normal, and you still rent a lift to refinish the elevation to the nearest control joint.

WHY IT'S AN EIFS AND STUCCO PROBLEM

Most trades get callbacks on defects. You get called back on something the industry itself defines as normal, on a monolithic surface where the cosmetic repair is bounded by control joints and has nothing to do with the size of the crack. The call comes in a year after close, so the cost goes to overhead and never touches the job that caused it.

WHAT IT COSTS

The size of it

A $250 crack turns into a $5,000 to $9,000 elevation refinish, and warranty work in this trade routinely runs 1 to 3 points of revenue.

OVERHEAD AT $1M–$5M
15%
CFOS target 14% for EIFS and stucco.
GROSS MARGIN AT $1M–$5M
23%
CFOS target 25.5% for EIFS and stucco.
NET PROFIT AT $1M–$5M
8%
CFOS target 11.5% for EIFS and stucco.

SMA's crack policy says owners should expect hairline cracks and diagonal cracks running off window and door corners, and that industry practice is to repair cracks exceeding a sixteenth of an inch. The catch is that cured, weathered stucco can't be patched invisibly, so a spot repair reads as a patch under the same critical light the acceptance walkthrough used. The honest fix is a fog coat or a full refinish of the elevation to the nearest control joint, plus access equipment to get back up a three story wall, plus mobilization for about one man day of real work. Those calls come in after the first full thermal and freeze cycle, six to eighteen months past acceptance, which is well after you closed the job in your books.

WHAT TO DO

Three moves, in order

STEP 01
Open a warranty cost code under the original job number and keep the job open in job cost for two years past acceptance, so callbacks get charged where they belong.
STEP 02
Tag every callback with the crew that ran the elevation, the GC, and the detail the crack came off, then sort that list quarterly to see which of the three keeps repeating.
STEP 03
Put the SMA crack language in both your proposal and your closeout letter, and set a fog coat unit rate so the ones you choose to do are priced before the phone rings.
QUESTIONS

What EIFS and stucco owners ask

How do I track stucco warranty callbacks after the job is closed?

It's a hairline off a window corner and the industry calls that normal, and you still rent a lift to refinish the elevation to the nearest control joint.

What does it cost?

A $250 crack turns into a $5,000 to $9,000 elevation refinish, and warranty work in this trade routinely runs 1 to 3 points of revenue.

What do I do first?

Open a warranty cost code under the original job number and keep the job open in job cost for two years past acceptance, so callbacks get charged where they belong.

What are EIFS and stucco contractors supposed to be making?

EIFS and stucco runs 23% gross margin, 15% overhead and 8% net profit before taxes at $1M–$5M. The all-trade average is 7%, so this trade is 1 point above it. The CFOS target is 11.5%.

Which part of the system fixes it?

The step is number 01, job cost structure. Seven cost categories and three levels of granularity, built so the estimate and the ledger use the same words. It comes from chapter 1 of CONTROL: C.F.O.S. Construction Financial Operating System.

OR HAVE IT HANDLED

Everything on this page is something you can install yourself, and CONTROL is the order to do it in. If you would rather buy the finished result, SPM The Construction CFO does this work for EIFS and stucco contractors as a service. It is a separate firm, Sulphur Prairie Management, LLC, run by the same author.

What a fractional CFO does for EIFS and stucco contractors

AUTHOR
Josh Luebker
JOSH LUEBKER
MASTER ELECTRICIAN · 150+ PROJECTS · $2.1B+ MANAGED

Wrote CONTROL, the 8 step system behind these figures. More about the author.

8 Steps 60 Days

CONTROL is the full system, written for commercial subcontractors from under $1M to $100M. It's out now. 8 steps, 6 working templates, and the order they install in. $9.99 ebook, $24.99 paperback.