CFOS for QuickBooks, coming January 2027See what you get
CFOSCIVIL AND EXCAVATION
CFOS FOR QUICKBOOKS · CIVIL AND EXCAVATION

Job costing for civil and excavation contractors

You met us at Dirt World, so here's how CFOS handles what civil and excavation contractors struggle with. Equipment hours, trucking, unit price billing and pay app cutoffs are covered. It all works on top of QuickBooks Online.

Every Monday we email the list what we built that week, with screenshots or a short video, and we email you the day it opens. Your address stays with Run On CFOS. One click unsubscribes.

Early access offer: everyone on this list before CFOS for QuickBooks opens gets 12 months with no subscription fee, counted from the day it opens in January 2027. During those 12 months the only charge is AI use, billed every Monday at what it costs us plus 10 percent for the work of billing it. Pay by bank transfer (ACH) and that is the whole charge, and pay by card and 3 percent is added for the card fee. After the 12 months the regular monthly price for your size starts, and you can cancel anytime before then with nothing owed but the AI you used.

30 days free, a 90-day money-back guarantee, and cancel anytime. It opens January 2027. We email you every Monday with what we built, and the day it opens.

EQUIPMENT

Equipment hours and daily rates

Your machines are your biggest cost and the easiest to lose track of. The operator logs hours on the daily, and CFOS charges the machine to the job each day it's on a daily at a rate. That rate comes from what it costs to own the machine, so the job pays for the dozer and not a guess.

Owning cost means payments, insurance, repairs and fuel spread over the hours you expect to use it. Set the rate once for each machine and CFOS applies it. When a job goes long, you can see the equipment line going over before the pay app goes out.

TRUCKING

Trucking by the hour or by the load

Trucking is where excavation jobs leak. Some haulers charge by the hour and some by the load, and tickets come in as a stack of paper at the end of the week. CFOS codes trucking to its own cost code on the job, whether it's hourly or per load, and you check each bill against the tickets before it's paid.

A bill emailed to your bills inbox is read, coded to the job and checked against the PO. If the hauler's bill is higher than what you committed, you see it before you pay. That one check saves more than most owners expect.

BILLING

Unit price billing, T&M, pay app cutoffs and retention

Unit price jobs get billed by the cubic yard or the ton, and the quantities change every month. CFOS builds the G702 and G703 for unit price and lump sum work, so you bill the quantity installed against the price in the schedule of values. You see the quantity left on each item, which tells you whether the job is going to overrun.

T&M tickets ride on the daily. The foreman records the crew, the equipment and photos, the GC signs on site, and it becomes a change order draft for the next pay app. Pay app cutoffs come with reminders to the PM, and retention is tracked on every pay app so you know what's held.

YOUR TRADE

Where to go next for your kind of work

Excavation, sitework, underground utility and SWPPP each have their own cost codes and their own way of losing money. The trade pages below show the codes we start with for each one. Pricing is a flat monthly amount based on your revenue, with every module included, so you can see what it costs before you ask us anything.

AT YOUR SIZE

At your size, the equipment rate and the trucking tickets are usually the first two things worth fixing. Both are set up once. After that they work on every job.

90-DAY MONEY-BACK · CANCEL ANYTIME

Get on the list for the day it opens

30 days free, a 90-day money-back guarantee, and cancel anytime.

Every Monday we email the list what we built that week, with screenshots or a short video, and we email you the day it opens. Your address stays with Run On CFOS. One click unsubscribes.

Early access offer: everyone on this list before CFOS for QuickBooks opens gets 12 months with no subscription fee, counted from the day it opens in January 2027. During those 12 months the only charge is AI use, billed every Monday at what it costs us plus 10 percent for the work of billing it. Pay by bank transfer (ACH) and that is the whole charge, and pay by card and 3 percent is added for the card fee. After the 12 months the regular monthly price for your size starts, and you can cancel anytime before then with nothing owed but the AI you used.

30 days free, a 90-day money-back guarantee, and cancel anytime. It opens January 2027. We email you every Monday with what we built, and the day it opens.

QUESTIONS

What people ask

Can CFOS handle hauling by the load?

Yes. Trucking has its own cost code, and you code the hauler's bill to the job by the hour or by the load. The bill is checked against the PO before it's paid.

How are equipment daily rates set?

From what it costs to own the machine. You set a rate per machine. CFOS charges it to the job for each day the machine is on a daily.

Does it work for unit price contracts?

Yes. CFOS produces G702 and G703 pay apps for unit price and lump sum jobs. You bill the quantity in place each month against the price in the schedule of values.

Is the price based on my revenue?

Yes. It starts at $300 a month for a company under $3.5M of revenue. Every module is included at every price, and the bill follows your revenue.

Updated

8 Steps 60 Days

CONTROL is the full system, written for commercial subcontractors from $1M to $100M. It's out now. 8 steps, 6 working templates, and the order they install in. $9.99 ebook, $24.99 paperback.