Job cost code template
Two separate cost code structures, one built for a subcontractor and one built for a general contractor, because the two trades sort cost differently.
The template covers
Set these codes up once in CFOS
CFOS keeps your cost codes on three levels with the seven cost types, and it matches them to QuickBooks Online. Bills, time and equipment post to the right code on the right job. The estimate imports as the job budget by cost code, so budget against actual means something from day one.
See what CFOS for QuickBooks does or read how the module works.
This one is gated
Scanning the QR code in chapter 1 opens it with nothing to type. If you typed the address yourself, enter the key printed under that code. It's the same key on every chapter, so one look at any of them opens all 6.
No key? Get CONTROL. The key's printed inside it, under the QR code at the end of 6 of the 8 chapters.
GET CONTROLStep 01: Job cost structure
Seven cost categories and three levels of granularity, built so the estimate and the ledger use the same words.