Equipment and vehicle cost basis worksheet
Ownership, maintenance and insurance in one sheet, so every machine and truck gets charged to the job that used it.
The template covers
Let CFOS charge the machine to the job
The Chapter 2 workbook uploads straight into CFOS. Each machine gets a daily or hourly rate from what it costs to own, and that cost goes on the job every day the machine is on a daily report. You stop pricing equipment from a guess.
See what CFOS for QuickBooks does or read how the module works.
This one is gated
Scanning the QR code in chapter 2 opens it with nothing to type. If you typed the address yourself, enter the key printed under that code. It's the same key on every chapter, so one look at any of them opens all 6.
No key? Get CONTROL. The key's printed inside it, under the QR code at the end of 6 of the 8 chapters.
GET CONTROLStep 02: Equipment cost basis
A correct internal rate per machine covering ownership, maintenance, fuel, and transport, charged to the projects that used it.