How to decide which jobs to bid

The estimator bids what comes in, because no one above them decided what the company should be bidding.

DIRECT ANSWER

Deciding what to bid belongs to leadership, as part of the business strategy. The decision draws on the cash flow forecast and the labor forecast, along with relationship factors. The final bid price is a separate decision. Operations or the COO, estimating, the potential PM and the superintendent review it in a meeting of the minds before it goes out the door.

WHAT TO DO

Three moves, in order

STEP 01
Have leadership set what the company bids, using the cash flow forecast and the labor forecast.
STEP 02
Add the relationship factors to the decision, and write down which ones count.
STEP 03
Hold the final price review with operations, estimating, the potential PM and the superintendent.
HOW CFOS HANDLES THIS

What CFOS does about it

The bid pipeline in CFOS holds each bid with its value, its bid date and its chance of winning. Lost bids stay on the list, so you see what you bid and what you win. The cash forecast tells you which weeks need work. Deciding what the company should bid is still the owner's call, and CFOS gives that call better numbers.

Who owns this: Owner or president.

AT YOUR SIZE

At $7M, the estimator can bid more than the crews can build. List the jobs you've won in the last year by type and by GC. Then pick the two kinds you want more of.

Every Monday we email the list what we built that week, with screenshots or a short video, and we email you the day it opens. Your address stays with Run On CFOS. One click unsubscribes.

Early access offer: everyone on this list before CFOS for QuickBooks opens gets 12 months with no subscription fee, counted from the day it opens in January 2027. During those 12 months the only charge is AI use, billed every Monday at what it costs us plus 10 percent for the work of billing it. Pay by bank transfer (ACH) and that is the whole charge, and pay by card and 3 percent is added for the card fee. After the 12 months the regular monthly price for your size starts, and you can cancel anytime before then with nothing owed but the AI you used.

30 days free, a 90-day money-back guarantee, and cancel anytime. It opens January 2027. We email you every Monday with what we built, and the day it opens.

WHAT THE INDUSTRY REPORTS

Research from another source

These figures come from another company's survey, not from Run On CFOS. Each one cites the report and the page.

Billd's 2026 National Subcontractor Market Report found 14 percent of subcontractors won more than half of their bids in 2025, down from 25 percent in 2024.

Source: Billd, 2026 National Subcontractor Market Report, page 16 (survey of 623 respondents, published May 13, 2026).

Billd's 2025 National Subcontractor Market Report found 32 percent of subcontractors who typically include the cost of working capital in their bids won more than half their bids, against 19 percent of those who rarely or never do.

Source: Billd, 2025 National Subcontractor Market Report, page 14 (survey of over 800 construction professionals, published April 15, 2025).

TRAINING

Learn this part of the job

SPM The Construction CFO publishes this course. It's a separate company from this one, and the course is on its own school site.

QUESTIONS

What owners ask

How do construction estimators decide which projects to bid?

The estimator bids what comes in, because no one above them decided what the company should be bidding. Deciding what to bid belongs to leadership, as part of the business strategy. The decision draws on the cash flow forecast and the labor forecast, along with relationship factors. The final bid price is a separate decision. Operations or the COO, estimating, the potential PM and the superintendent review it in a meeting of the minds before it goes out the door.

Which part of the system fixes this?

The step is number 04, estimating system. The estimate maps one to one onto the job cost codes, so variance means something the day it appears. It's drawn from chapter 4 of CONTROL: C.F.O.S. Construction Financial Operating System.

Is this normal for my trade?

Across the 48 trades that publish a figure, net profit at $1M to $5M averages 7% before taxes. If you're well under that and this page describes your month, the two are usually the same story. The published average tells you where the pack is, and your own job costing tells you where you are, which is the number that pays payroll.

Where do I start?

Have leadership set what the company bids, using the cash flow forecast and the labor forecast.

Can I fix this without touching anything else?

You can try, and it doesn't hold. Step 04 depends on step 01, job cost structure and step 03, overhead calculation. Install it ahead of those and it produces numbers the field won't trust, which is worse than the problem you started with.

AUTHOR
Josh Luebker
JOSH LUEBKER
MASTER ELECTRICIAN · 150+ PROJECTS · $2.1B+ MANAGED

Wrote CONTROL, the 8 step system behind these figures. More about the author.

Updated

8 Steps 60 Days

CONTROL is the full system, written for commercial subcontractors from $1M to $100M. It's out now. 8 steps, 6 working templates, and the order they install in. $9.99 ebook, $24.99 paperback.