CFOS-07MONTHLY CADENCE
THE PROBLEM · FIXED BY STEP 07 · KEEP YOUR PROFIT

You bid low and the job is already under way

The job is under way, the bid was too low and every week adds cost to a number no one checks.

DIRECT ANSWER

The prevention comes before the bid goes out, when operations, the COO, estimating, the PM and the superintendent review the final price together. Once the job is under way, the cost to complete meeting finds the problem. It happens after the books close, on a dedicated day, and it's about help and not blame. Each cause has its own next step. If the estimate missed, estimating fixes the process. If the company miscalculated, it absorbs the cost, and the PM tries to make some of it up on every change order. If something on site is slowing the work, an RFI can speed it up.

WHAT TO DO

Three moves, in order

STEP 01
Hold the cost to complete meeting every month, once the books are closed.
STEP 02
For each job trending over, find which cause it is and give it an owner.
STEP 03
Take what the estimating team missed back into the next bid review.
HOW CFOS HANDLES THIS

What CFOS does about it

The PM enters cost to complete at month end, and an owner sees which jobs are going over the budget. CFOS compares job cost by cost code to the estimate, updated every hour, so you can see which code is losing money. Overbilling and underbilling show on the WIP schedule. Deciding to absorb the loss or push on change orders is still a conversation you have with your team.

Who owns this: Owner and project manager.

AT YOUR SIZE

At $6M, a single low bid can cost the profit of three good jobs. Find the cost codes where the job is over budget first. Then hold the cost to complete meeting before the next pay app goes out.

Every Monday we email the list what we built that week, with screenshots or a short video, and we email you the day it opens. Your address stays with Run On CFOS. One click unsubscribes.

Early access offer: everyone on this list before CFOS for QuickBooks opens gets 12 months with no subscription fee, counted from the day it opens in January 2027. During those 12 months the only charge is AI use, billed every Monday at what it costs us plus 10 percent for the work of billing it. Pay by bank transfer (ACH) and that is the whole charge, and pay by card and 3 percent is added for the card fee. After the 12 months the regular monthly price for your size starts, and you can cancel anytime before then with nothing owed but the AI you used.

30 days free, a 90-day money-back guarantee, and cancel anytime. It opens January 2027. We email you every Monday with what we built, and the day it opens.

TRAINING

Learn this part of the job

SPM The Construction CFO publishes this course. It's a separate company from this one, and the course is on its own school site.

QUESTIONS

What owners ask

I bid low on the current project what do I do?

The job is under way, the bid was too low and every week adds cost to a number no one checks. The prevention comes before the bid goes out, when operations, the COO, estimating, the PM and the superintendent review the final price together. Once the job is under way, the cost to complete meeting finds the problem. It happens after the books close, on a dedicated day, and it's about help and not blame. Each cause has its own next step. If the estimate missed, estimating fixes the process. If the company miscalculated, it absorbs the cost, and the PM tries to make some of it up on every change order. If something on site is slowing the work, an RFI can speed it up.

Which part of the system fixes this?

The step is number 07, monthly cadence. Weekly bookkeeping, cost to complete, and one CEO report, on the same days every month. It's drawn from chapter 7 of CONTROL: C.F.O.S. Construction Financial Operating System.

Is this normal for my trade?

Across the 48 trades that publish a figure, net profit at $1M to $5M averages 7% before taxes. If you're well under that and this page describes your month, the two are usually the same story. The published average tells you where the pack is, and your own job costing tells you where you are, which is the number that pays payroll.

Where do I start?

Hold the cost to complete meeting every month, once the books are closed.

Can I fix this without touching anything else?

You can try, and it doesn't hold. Step 07 depends on step 03, overhead calculation and step 04, estimating system and step 05, software and bookkeeping alignment and step 06, project management. Install it ahead of those and it produces numbers the field won't trust, which is worse than the problem you started with.

AUTHOR
Josh Luebker
JOSH LUEBKER
MASTER ELECTRICIAN · 150+ PROJECTS · $2.1B+ MANAGED

Wrote CONTROL, the 8 step system behind these figures. More about the author.

Updated

8 Steps 60 Days

CONTROL is the full system, written for commercial subcontractors from $1M to $100M. It's out now. 8 steps, 6 working templates, and the order they install in. $9.99 ebook, $24.99 paperback.