CHARTLABOR BURDEN
LABOR BURDEN CHART

Labor burden chart

Every hourly wage from $15.00 to $150.00, every 50 cents, with 30 to 40% labor burden added, as a range and at 30%, 35% and 40%. Find the wage and read across to what one hour costs.

Published October 17, 2026. Updated October 17, 2026.

THE ANSWER

A $30.00 hourly wage costs $39.00 to $42.00 an hour at 30 to 40 percent labor burden: $39.00 at 30 percent, $40.50 at 35 percent and $42.00 at 40 percent.

A $30.00 wage at 35 percent burden is $30.00 x 1.35 = $40.50 an hour.

  • Labor burden. Labor burden is every cost of employing a person beyond the wage on the paycheck: employer payroll taxes, workers compensation, insurance, benefits and paid time off. It's stated as a percent of the wage.
  • Formula. Burdened hourly cost = hourly wage x (1 + burden percent). Each cost is rounded to the nearest cent, and a half cent rounds up.
THE CHART

Hourly wage to burdened hourly cost

271 wages, $15.00 to $150.00. Each column is the cost of one paid hour at that burden.

$15.00 to $24.50$25.00 to $34.50$35.00 to $44.50$45.00 to $54.50$55.00 to $64.50$65.00 to $74.50$75.00 to $84.50$85.00 to $94.50$95.00 to $104.50$105.00 to $114.50$115.00 to $124.50$125.00 to $134.50$135.00 to $144.50$145.00 to $150.00

Burdened hourly cost by hourly wage and labor burden percent. Updated October 17, 2026.
Hourly wageRange at 30 to 40% burdenAt 30% burdenAt 35% burdenAt 40% burden
$15.00$19.50 to $21.00$19.50$20.25$21.00
$15.50$20.15 to $21.70$20.15$20.93$21.70
$16.00$20.80 to $22.40$20.80$21.60$22.40
$16.50$21.45 to $23.10$21.45$22.28$23.10
$17.00$22.10 to $23.80$22.10$22.95$23.80
$17.50$22.75 to $24.50$22.75$23.63$24.50
$18.00$23.40 to $25.20$23.40$24.30$25.20
$18.50$24.05 to $25.90$24.05$24.98$25.90
$19.00$24.70 to $26.60$24.70$25.65$26.60
$19.50$25.35 to $27.30$25.35$26.33$27.30
$20.00$26.00 to $28.00$26.00$27.00$28.00
$20.50$26.65 to $28.70$26.65$27.68$28.70
$21.00$27.30 to $29.40$27.30$28.35$29.40
$21.50$27.95 to $30.10$27.95$29.03$30.10
$22.00$28.60 to $30.80$28.60$29.70$30.80
$22.50$29.25 to $31.50$29.25$30.38$31.50
$23.00$29.90 to $32.20$29.90$31.05$32.20
$23.50$30.55 to $32.90$30.55$31.73$32.90
$24.00$31.20 to $33.60$31.20$32.40$33.60
$24.50$31.85 to $34.30$31.85$33.08$34.30
$25.00$32.50 to $35.00$32.50$33.75$35.00
$25.50$33.15 to $35.70$33.15$34.43$35.70
$26.00$33.80 to $36.40$33.80$35.10$36.40
$26.50$34.45 to $37.10$34.45$35.78$37.10
$27.00$35.10 to $37.80$35.10$36.45$37.80
$27.50$35.75 to $38.50$35.75$37.13$38.50
$28.00$36.40 to $39.20$36.40$37.80$39.20
$28.50$37.05 to $39.90$37.05$38.48$39.90
$29.00$37.70 to $40.60$37.70$39.15$40.60
$29.50$38.35 to $41.30$38.35$39.83$41.30
$30.00$39.00 to $42.00$39.00$40.50$42.00
$30.50$39.65 to $42.70$39.65$41.18$42.70
$31.00$40.30 to $43.40$40.30$41.85$43.40
$31.50$40.95 to $44.10$40.95$42.53$44.10
$32.00$41.60 to $44.80$41.60$43.20$44.80
$32.50$42.25 to $45.50$42.25$43.88$45.50
$33.00$42.90 to $46.20$42.90$44.55$46.20
$33.50$43.55 to $46.90$43.55$45.23$46.90
$34.00$44.20 to $47.60$44.20$45.90$47.60
$34.50$44.85 to $48.30$44.85$46.58$48.30
$35.00$45.50 to $49.00$45.50$47.25$49.00
$35.50$46.15 to $49.70$46.15$47.93$49.70
$36.00$46.80 to $50.40$46.80$48.60$50.40
$36.50$47.45 to $51.10$47.45$49.28$51.10
$37.00$48.10 to $51.80$48.10$49.95$51.80
$37.50$48.75 to $52.50$48.75$50.63$52.50
$38.00$49.40 to $53.20$49.40$51.30$53.20
$38.50$50.05 to $53.90$50.05$51.98$53.90
$39.00$50.70 to $54.60$50.70$52.65$54.60
$39.50$51.35 to $55.30$51.35$53.33$55.30
$40.00$52.00 to $56.00$52.00$54.00$56.00
$40.50$52.65 to $56.70$52.65$54.68$56.70
$41.00$53.30 to $57.40$53.30$55.35$57.40
$41.50$53.95 to $58.10$53.95$56.03$58.10
$42.00$54.60 to $58.80$54.60$56.70$58.80
$42.50$55.25 to $59.50$55.25$57.38$59.50
$43.00$55.90 to $60.20$55.90$58.05$60.20
$43.50$56.55 to $60.90$56.55$58.73$60.90
$44.00$57.20 to $61.60$57.20$59.40$61.60
$44.50$57.85 to $62.30$57.85$60.08$62.30
$45.00$58.50 to $63.00$58.50$60.75$63.00
$45.50$59.15 to $63.70$59.15$61.43$63.70
$46.00$59.80 to $64.40$59.80$62.10$64.40
$46.50$60.45 to $65.10$60.45$62.78$65.10
$47.00$61.10 to $65.80$61.10$63.45$65.80
$47.50$61.75 to $66.50$61.75$64.13$66.50
$48.00$62.40 to $67.20$62.40$64.80$67.20
$48.50$63.05 to $67.90$63.05$65.48$67.90
$49.00$63.70 to $68.60$63.70$66.15$68.60
$49.50$64.35 to $69.30$64.35$66.83$69.30
$50.00$65.00 to $70.00$65.00$67.50$70.00
$50.50$65.65 to $70.70$65.65$68.18$70.70
$51.00$66.30 to $71.40$66.30$68.85$71.40
$51.50$66.95 to $72.10$66.95$69.53$72.10
$52.00$67.60 to $72.80$67.60$70.20$72.80
$52.50$68.25 to $73.50$68.25$70.88$73.50
$53.00$68.90 to $74.20$68.90$71.55$74.20
$53.50$69.55 to $74.90$69.55$72.23$74.90
$54.00$70.20 to $75.60$70.20$72.90$75.60
$54.50$70.85 to $76.30$70.85$73.58$76.30
$55.00$71.50 to $77.00$71.50$74.25$77.00
$55.50$72.15 to $77.70$72.15$74.93$77.70
$56.00$72.80 to $78.40$72.80$75.60$78.40
$56.50$73.45 to $79.10$73.45$76.28$79.10
$57.00$74.10 to $79.80$74.10$76.95$79.80
$57.50$74.75 to $80.50$74.75$77.63$80.50
$58.00$75.40 to $81.20$75.40$78.30$81.20
$58.50$76.05 to $81.90$76.05$78.98$81.90
$59.00$76.70 to $82.60$76.70$79.65$82.60
$59.50$77.35 to $83.30$77.35$80.33$83.30
$60.00$78.00 to $84.00$78.00$81.00$84.00
$60.50$78.65 to $84.70$78.65$81.68$84.70
$61.00$79.30 to $85.40$79.30$82.35$85.40
$61.50$79.95 to $86.10$79.95$83.03$86.10
$62.00$80.60 to $86.80$80.60$83.70$86.80
$62.50$81.25 to $87.50$81.25$84.38$87.50
$63.00$81.90 to $88.20$81.90$85.05$88.20
$63.50$82.55 to $88.90$82.55$85.73$88.90
$64.00$83.20 to $89.60$83.20$86.40$89.60
$64.50$83.85 to $90.30$83.85$87.08$90.30
$65.00$84.50 to $91.00$84.50$87.75$91.00
$65.50$85.15 to $91.70$85.15$88.43$91.70
$66.00$85.80 to $92.40$85.80$89.10$92.40
$66.50$86.45 to $93.10$86.45$89.78$93.10
$67.00$87.10 to $93.80$87.10$90.45$93.80
$67.50$87.75 to $94.50$87.75$91.13$94.50
$68.00$88.40 to $95.20$88.40$91.80$95.20
$68.50$89.05 to $95.90$89.05$92.48$95.90
$69.00$89.70 to $96.60$89.70$93.15$96.60
$69.50$90.35 to $97.30$90.35$93.83$97.30
$70.00$91.00 to $98.00$91.00$94.50$98.00
$70.50$91.65 to $98.70$91.65$95.18$98.70
$71.00$92.30 to $99.40$92.30$95.85$99.40
$71.50$92.95 to $100.10$92.95$96.53$100.10
$72.00$93.60 to $100.80$93.60$97.20$100.80
$72.50$94.25 to $101.50$94.25$97.88$101.50
$73.00$94.90 to $102.20$94.90$98.55$102.20
$73.50$95.55 to $102.90$95.55$99.23$102.90
$74.00$96.20 to $103.60$96.20$99.90$103.60
$74.50$96.85 to $104.30$96.85$100.58$104.30
$75.00$97.50 to $105.00$97.50$101.25$105.00
$75.50$98.15 to $105.70$98.15$101.93$105.70
$76.00$98.80 to $106.40$98.80$102.60$106.40
$76.50$99.45 to $107.10$99.45$103.28$107.10
$77.00$100.10 to $107.80$100.10$103.95$107.80
$77.50$100.75 to $108.50$100.75$104.63$108.50
$78.00$101.40 to $109.20$101.40$105.30$109.20
$78.50$102.05 to $109.90$102.05$105.98$109.90
$79.00$102.70 to $110.60$102.70$106.65$110.60
$79.50$103.35 to $111.30$103.35$107.33$111.30
$80.00$104.00 to $112.00$104.00$108.00$112.00
$80.50$104.65 to $112.70$104.65$108.68$112.70
$81.00$105.30 to $113.40$105.30$109.35$113.40
$81.50$105.95 to $114.10$105.95$110.03$114.10
$82.00$106.60 to $114.80$106.60$110.70$114.80
$82.50$107.25 to $115.50$107.25$111.38$115.50
$83.00$107.90 to $116.20$107.90$112.05$116.20
$83.50$108.55 to $116.90$108.55$112.73$116.90
$84.00$109.20 to $117.60$109.20$113.40$117.60
$84.50$109.85 to $118.30$109.85$114.08$118.30
$85.00$110.50 to $119.00$110.50$114.75$119.00
$85.50$111.15 to $119.70$111.15$115.43$119.70
$86.00$111.80 to $120.40$111.80$116.10$120.40
$86.50$112.45 to $121.10$112.45$116.78$121.10
$87.00$113.10 to $121.80$113.10$117.45$121.80
$87.50$113.75 to $122.50$113.75$118.13$122.50
$88.00$114.40 to $123.20$114.40$118.80$123.20
$88.50$115.05 to $123.90$115.05$119.48$123.90
$89.00$115.70 to $124.60$115.70$120.15$124.60
$89.50$116.35 to $125.30$116.35$120.83$125.30
$90.00$117.00 to $126.00$117.00$121.50$126.00
$90.50$117.65 to $126.70$117.65$122.18$126.70
$91.00$118.30 to $127.40$118.30$122.85$127.40
$91.50$118.95 to $128.10$118.95$123.53$128.10
$92.00$119.60 to $128.80$119.60$124.20$128.80
$92.50$120.25 to $129.50$120.25$124.88$129.50
$93.00$120.90 to $130.20$120.90$125.55$130.20
$93.50$121.55 to $130.90$121.55$126.23$130.90
$94.00$122.20 to $131.60$122.20$126.90$131.60
$94.50$122.85 to $132.30$122.85$127.58$132.30
$95.00$123.50 to $133.00$123.50$128.25$133.00
$95.50$124.15 to $133.70$124.15$128.93$133.70
$96.00$124.80 to $134.40$124.80$129.60$134.40
$96.50$125.45 to $135.10$125.45$130.28$135.10
$97.00$126.10 to $135.80$126.10$130.95$135.80
$97.50$126.75 to $136.50$126.75$131.63$136.50
$98.00$127.40 to $137.20$127.40$132.30$137.20
$98.50$128.05 to $137.90$128.05$132.98$137.90
$99.00$128.70 to $138.60$128.70$133.65$138.60
$99.50$129.35 to $139.30$129.35$134.33$139.30
$100.00$130.00 to $140.00$130.00$135.00$140.00
$100.50$130.65 to $140.70$130.65$135.68$140.70
$101.00$131.30 to $141.40$131.30$136.35$141.40
$101.50$131.95 to $142.10$131.95$137.03$142.10
$102.00$132.60 to $142.80$132.60$137.70$142.80
$102.50$133.25 to $143.50$133.25$138.38$143.50
$103.00$133.90 to $144.20$133.90$139.05$144.20
$103.50$134.55 to $144.90$134.55$139.73$144.90
$104.00$135.20 to $145.60$135.20$140.40$145.60
$104.50$135.85 to $146.30$135.85$141.08$146.30
$105.00$136.50 to $147.00$136.50$141.75$147.00
$105.50$137.15 to $147.70$137.15$142.43$147.70
$106.00$137.80 to $148.40$137.80$143.10$148.40
$106.50$138.45 to $149.10$138.45$143.78$149.10
$107.00$139.10 to $149.80$139.10$144.45$149.80
$107.50$139.75 to $150.50$139.75$145.13$150.50
$108.00$140.40 to $151.20$140.40$145.80$151.20
$108.50$141.05 to $151.90$141.05$146.48$151.90
$109.00$141.70 to $152.60$141.70$147.15$152.60
$109.50$142.35 to $153.30$142.35$147.83$153.30
$110.00$143.00 to $154.00$143.00$148.50$154.00
$110.50$143.65 to $154.70$143.65$149.18$154.70
$111.00$144.30 to $155.40$144.30$149.85$155.40
$111.50$144.95 to $156.10$144.95$150.53$156.10
$112.00$145.60 to $156.80$145.60$151.20$156.80
$112.50$146.25 to $157.50$146.25$151.88$157.50
$113.00$146.90 to $158.20$146.90$152.55$158.20
$113.50$147.55 to $158.90$147.55$153.23$158.90
$114.00$148.20 to $159.60$148.20$153.90$159.60
$114.50$148.85 to $160.30$148.85$154.58$160.30
$115.00$149.50 to $161.00$149.50$155.25$161.00
$115.50$150.15 to $161.70$150.15$155.93$161.70
$116.00$150.80 to $162.40$150.80$156.60$162.40
$116.50$151.45 to $163.10$151.45$157.28$163.10
$117.00$152.10 to $163.80$152.10$157.95$163.80
$117.50$152.75 to $164.50$152.75$158.63$164.50
$118.00$153.40 to $165.20$153.40$159.30$165.20
$118.50$154.05 to $165.90$154.05$159.98$165.90
$119.00$154.70 to $166.60$154.70$160.65$166.60
$119.50$155.35 to $167.30$155.35$161.33$167.30
$120.00$156.00 to $168.00$156.00$162.00$168.00
$120.50$156.65 to $168.70$156.65$162.68$168.70
$121.00$157.30 to $169.40$157.30$163.35$169.40
$121.50$157.95 to $170.10$157.95$164.03$170.10
$122.00$158.60 to $170.80$158.60$164.70$170.80
$122.50$159.25 to $171.50$159.25$165.38$171.50
$123.00$159.90 to $172.20$159.90$166.05$172.20
$123.50$160.55 to $172.90$160.55$166.73$172.90
$124.00$161.20 to $173.60$161.20$167.40$173.60
$124.50$161.85 to $174.30$161.85$168.08$174.30
$125.00$162.50 to $175.00$162.50$168.75$175.00
$125.50$163.15 to $175.70$163.15$169.43$175.70
$126.00$163.80 to $176.40$163.80$170.10$176.40
$126.50$164.45 to $177.10$164.45$170.78$177.10
$127.00$165.10 to $177.80$165.10$171.45$177.80
$127.50$165.75 to $178.50$165.75$172.13$178.50
$128.00$166.40 to $179.20$166.40$172.80$179.20
$128.50$167.05 to $179.90$167.05$173.48$179.90
$129.00$167.70 to $180.60$167.70$174.15$180.60
$129.50$168.35 to $181.30$168.35$174.83$181.30
$130.00$169.00 to $182.00$169.00$175.50$182.00
$130.50$169.65 to $182.70$169.65$176.18$182.70
$131.00$170.30 to $183.40$170.30$176.85$183.40
$131.50$170.95 to $184.10$170.95$177.53$184.10
$132.00$171.60 to $184.80$171.60$178.20$184.80
$132.50$172.25 to $185.50$172.25$178.88$185.50
$133.00$172.90 to $186.20$172.90$179.55$186.20
$133.50$173.55 to $186.90$173.55$180.23$186.90
$134.00$174.20 to $187.60$174.20$180.90$187.60
$134.50$174.85 to $188.30$174.85$181.58$188.30
$135.00$175.50 to $189.00$175.50$182.25$189.00
$135.50$176.15 to $189.70$176.15$182.93$189.70
$136.00$176.80 to $190.40$176.80$183.60$190.40
$136.50$177.45 to $191.10$177.45$184.28$191.10
$137.00$178.10 to $191.80$178.10$184.95$191.80
$137.50$178.75 to $192.50$178.75$185.63$192.50
$138.00$179.40 to $193.20$179.40$186.30$193.20
$138.50$180.05 to $193.90$180.05$186.98$193.90
$139.00$180.70 to $194.60$180.70$187.65$194.60
$139.50$181.35 to $195.30$181.35$188.33$195.30
$140.00$182.00 to $196.00$182.00$189.00$196.00
$140.50$182.65 to $196.70$182.65$189.68$196.70
$141.00$183.30 to $197.40$183.30$190.35$197.40
$141.50$183.95 to $198.10$183.95$191.03$198.10
$142.00$184.60 to $198.80$184.60$191.70$198.80
$142.50$185.25 to $199.50$185.25$192.38$199.50
$143.00$185.90 to $200.20$185.90$193.05$200.20
$143.50$186.55 to $200.90$186.55$193.73$200.90
$144.00$187.20 to $201.60$187.20$194.40$201.60
$144.50$187.85 to $202.30$187.85$195.08$202.30
$145.00$188.50 to $203.00$188.50$195.75$203.00
$145.50$189.15 to $203.70$189.15$196.43$203.70
$146.00$189.80 to $204.40$189.80$197.10$204.40
$146.50$190.45 to $205.10$190.45$197.78$205.10
$147.00$191.10 to $205.80$191.10$198.45$205.80
$147.50$191.75 to $206.50$191.75$199.13$206.50
$148.00$192.40 to $207.20$192.40$199.80$207.20
$148.50$193.05 to $207.90$193.05$200.48$207.90
$149.00$193.70 to $208.60$193.70$201.15$208.60
$149.50$194.35 to $209.30$194.35$201.83$209.30
$150.00$195.00 to $210.00$195.00$202.50$210.00
A BLANKET ESTIMATE

Every person costs something different

This chart is a blanket estimate. A budget prices every labor hour for a position at one general burdened rate, and that's the right way to build an estimate.

Each person has their own burden
Each person costs something different once burden is counted. It depends on their actual hourly wage and their benefits: the insurance plan they take and how many dependents are on it, the 401k contribution they use, paid leave and their workers compensation class. An operator paid $29.50 an hour with five dependents on the company plan and a maxed out 401k can cost a very different burdened amount than an operator paid $25.00 an hour who is on a parent's insurance and only uses the 401k. Neither one equals the blanket rate.
Track actual against budget
Track actual labor cost against the budget on every job, from real payroll, and not only hours. The difference between the blanket rate and what each person really costs appears in that comparison.
Hours alone mislead
Hours alone are a bad labor metric, because the cost behind the hours decides the result. A superintendent and a journeyman can take the same number of hours to do the same task, and the superintendent can cost twice as much for each hour. If a superintendent costs twice what a journeyman does for each hour, the same 10 hour task costs $390.00 to $420.00 with a journeyman paid $30.00 an hour at 30 to 40 percent burden, and $780.00 to $840.00 with the superintendent, for the same 10 hours.
HOW TO READ IT

What the chart assumes

The range is an assumption
Run On CFOS chose 30, 35 and 40 percent as three working points for a bid or a job cost sheet. They are an assumption set for this chart, not a measured average for any trade or state. Your own rate depends on your workers compensation class, your state unemployment tax, your benefits and your paid leave, and it can fall above or below this range.
It prices a paid hour
Every row prices one paid hour. The chart doesn't adjust for paid hours that produce nothing, such as travel, weather days, holidays and paid time off. To price a productive hour, divide the burdened cost by the share of paid hours that are productive.
Find your own rate
To find your own rate, add every employer cost for one worker over a year, divide by that worker's wages for the year, and use that percent in the formula.

Sources and definitions on this page:

THE DATA

Download the chart

The same rows as a spreadsheet and as JSON, with every whole percent from 30 to 40. Both include the date and the credit on every row, and both change when this page changes.

QUESTIONS

What readers ask

What is the burdened hourly cost if an employee makes $20.00 an hour?

At 30 to 40 percent labor burden, a $20.00 hourly wage costs $26.00 to $28.00 an hour, which is $6.00 to $8.00 an hour of burden on top of the wage.

What is the burdened hourly cost if an employee makes $25.00 an hour?

At 30 to 40 percent labor burden, a $25.00 hourly wage costs $32.50 to $35.00 an hour, which is $7.50 to $10.00 an hour of burden on top of the wage.

What is the burdened hourly cost if an employee makes $30.00 an hour?

At 30 to 40 percent labor burden, a $30.00 hourly wage costs $39.00 to $42.00 an hour, which is $9.00 to $12.00 an hour of burden on top of the wage.

What is the burdened hourly cost if an employee makes $35.00 an hour?

At 30 to 40 percent labor burden, a $35.00 hourly wage costs $45.50 to $49.00 an hour, which is $10.50 to $14.00 an hour of burden on top of the wage.

What is the burdened hourly cost if an employee makes $40.00 an hour?

At 30 to 40 percent labor burden, a $40.00 hourly wage costs $52.00 to $56.00 an hour, which is $12.00 to $16.00 an hour of burden on top of the wage.

What is the burdened hourly cost if an employee makes $50.00 an hour?

At 30 to 40 percent labor burden, a $50.00 hourly wage costs $65.00 to $70.00 an hour, which is $15.00 to $20.00 an hour of burden on top of the wage.

What is the labor burden rate for a civil contractor crew?

Burden depends on the workers compensation class, state unemployment tax, benefits and paid leave, so this chart doesn't publish one rate for civil work. At 30 to 40 percent burden, a crew of 4 that each make $30.00 an hour costs $156.00 to $168.00 an hour, or $39.00 to $42.00 an hour for each person. Replace 30 to 40 percent with your own rate.

Does every employee have the same labor burden?

No. Each person costs something different once burden is counted. It depends on their actual hourly wage and their benefits: the insurance plan they take and how many dependents are on it, the 401k contribution they use, paid leave and their workers compensation class. An operator paid $29.50 an hour with five dependents on the company plan and a maxed out 401k can cost a very different burdened amount than an operator paid $25.00 an hour who is on a parent's insurance and only uses the 401k. Neither one equals the blanket rate.

Why are hours a bad labor metric?

Hours alone are a bad labor metric, because the cost behind the hours decides the result. A superintendent and a journeyman can take the same number of hours to do the same task, and the superintendent can cost twice as much for each hour. If a superintendent costs twice what a journeyman does for each hour, the same 10 hour task costs $390.00 to $420.00 with a journeyman paid $30.00 an hour at 30 to 40 percent burden, and $780.00 to $840.00 with the superintendent, for the same 10 hours.

Should I track actual labor cost against my budget?

Track actual labor cost against the budget on every job, from real payroll, and not only hours. The difference between the blanket rate and what each person really costs appears in that comparison.

What is labor burden in construction?

Labor burden is every cost of employing a person beyond the wage on the paycheck: employer payroll taxes, workers compensation, insurance, benefits and paid time off. It's stated as a percent of the wage.

How do you convert a wage to a burdened hourly cost?

Multiply the hourly wage by one plus the burden percent. The example is read from the table below.

What labor burden percent should a contractor use?

Use your own. Add every employer cost for one worker over a year and divide by that worker's wages for the year. The chart shows 30, 35 and 40 percent as working points, and a real rate can fall above or below them.

Does the chart price a paid hour or a productive hour?

A paid hour. Hours a crew is paid and not producing aren't adjusted for, so divide the burdened cost by the share of paid hours that are productive to price a productive hour.

CITING

If you are quoting this chart

CITE THIS

Run On CFOS. Labor burden chart. 2026. Sulphur Prairie Operations, LLC. https://runoncfos.com/labor-burden-chart. CC BY 4.0.

Figures on this page were last revised 2026-10-17. Published under CC BY 4.0, which permits reuse of any figure here, including commercially, as long as the credit above travels with it. The same figures in machine-readable form: /labor-burden-chart.json.

AUTHOR
Josh Luebker
JOSH LUEBKER
MASTER ELECTRICIAN · 150+ PROJECTS · $2.1B+ MANAGED

Wrote CONTROL, the 8 step system behind these figures. More about the author.

Updated

8 Steps 60 Days

CONTROL is the full system, written for commercial subcontractors from $1M to $100M. It's out now. 8 steps, 6 working templates, and the order they install in. $9.99 ebook, $24.99 paperback.