Retention sits a year while you still send a truck
Your final ten percent sits until the warranty walk, and you spend the entire hold period running crews back out there to earn it.
For everyone else, retention is a financing cost with nothing operational behind it. Yours has a crew, a truck, and replacement material attached to it for twelve straight months, so the job keeps consuming cash long after you closed it in your reporting. The bond line stays committed that whole period too, and that's the same capacity you need for the next bid.
The size of it
You've got ten percent of contract value plus a year of unbilled maintenance visits sitting out there, and a bonding line that won't release for the job you're trying to win now.
Most trades finish, demobilize, and then wait on retention with no cost line still running. Landscaping carries a one year plant guarantee past the last production day, and that guarantee is an active obligation: watering, mowing, and replacing anything with 25 percent or more dead branches per UFGS 32 93 00. The money stays out for 12 to 15 months while your spending continues the whole time. On public work a maintenance bond usually rides the same period, which ties up bonding capacity on a job you already finished and can't bill.
Three moves, in order
Step 01: Job cost structure
Seven cost categories and three levels of granularity, built so the estimate and the ledger use the same words.
What else costs landscaping and irrigation contractors money
The same mechanism in other trades
What landscaping and irrigation owners ask
Landscape retention held for the one year plant warranty?
Your final ten percent sits until the warranty walk, and you spend the entire hold period running crews back out there to earn it.
What does it cost?
You've got ten percent of contract value plus a year of unbilled maintenance visits sitting out there, and a bonding line that won't release for the job you're trying to win now.
What do I do first?
Keep the job open in job costing through the warranty period with a warranty and maintenance code, so post-completion visits hit the job that created them.
What are landscaping and irrigation contractors supposed to be making?
Landscaping and irrigation runs 22% gross margin, 15% overhead and 7% net profit before taxes at $1M–$5M. The all-trade average is 7%, so this trade sits right on it. The CFOS target is 10%.
Which part of the system fixes it?
The step is number 01, job cost structure. Seven cost categories and three levels of granularity, built so the estimate and the ledger use the same words. It comes from chapter 1 of CONTROL: The Construction Financial Operating System.
