FENCINGCFOS-02
FENCING · SPECIALTY · FIXED BY STEP 02

You Make Four Trips and the Bid Prices One

You make four trips to a job you priced like one trip, and the auger comes along on every one of them.

WHY IT'S A FENCING PROBLEM

The cure clock makes this a fencing problem. You can't mount a heavy gate leaf on a post you set yesterday. So the trade's own method needs a return trip before anyone else on site does anything wrong. You're also one of the last trades in, so your finished sections get cut out for other people's equipment. That's another trip with no change order.

WHAT IT COSTS

The size of it

Trips two through five are almost never in the bid and almost never billed. The last trade on site is also the one holding closeout, so backcharges for damage you didn't cause tend to be applied to that same final invoice.

OVERHEAD AT $1M to $5M
15%
Derived from Sitework, the nearest comparable trade. CFOS target 14%.
GROSS MARGIN AT $1M to $5M
18%
Derived from Sitework, the nearest comparable trade. CFOS target 24%.
NET PROFIT AT $1M to $5M
3%
Derived from Sitework, the nearest comparable trade. CFOS target 10%.

Permanent fence goes in after final grade and often after landscaping, so you're near the end of the sequence. Then the work splits into pieces. You set posts on the first trip and wait on concrete cure before setting panels and heavy gate leaves. A third trip covers gate operators and hardware. Punch list brings you back once more, along with the sections other trades cut out to move equipment through. Every trip moves a skid steer, an auger or post driver, and a trailer to the site. That equipment cost is charged once per mobilization no matter how many feet go in that day. On a $40,000 fence contract, mobilization is a visible share of the job. On a $2 million mechanical contract it's a rounding error.

WHAT TO DO

Three moves, in order

STEP 01
Count trips in the estimate the way the work really happens: post set, mount after cure, operators and hardware, and punch. Price all four.
STEP 02
Charge equipment to the job per mobilization, including the auger, post driver, skid steer, and trailer, so a fifth trip registers as a cost you can see.
STEP 03
Photograph completed sections at demob and email the super the same afternoon, so a section the excavator flattened becomes a change order and not a backcharge.
QUESTIONS

What fencing owners ask

How to price mobilization on a small fence job?

You make four trips to a job you priced like one trip, and the auger comes along on every one of them.

What does it cost?

Trips two through five are almost never in the bid and almost never billed. The last trade on site is also the one holding closeout, so backcharges for damage you didn't cause tend to be applied to that same final invoice.

What do I do first?

Count trips in the estimate the way the work really happens: post set, mount after cure, operators and hardware, and punch. Price all four.

What are fencing contractors supposed to be making?

No survey separates fencing, so there is no figure of its own. The nearest comparable trade in the reference is Sitework, which has 18% gross margin, 15% overhead and 3% net profit before taxes at $1M to $5M, with a CFOS target of 10% net. Those are derived figures, not fencing's own. Read them as the neighbourhood, and read your own job costing as the answer.

Which part of the system fixes it?

The step is number 02, equipment cost basis. A correct internal rate per machine covering ownership, maintenance, fuel, and transport, charged to the projects that used it. It comes from chapter 2 of CONTROL: C.F.O.S. Construction Financial Operating System.

OR HAVE IT HANDLED

Everything on this page is something you can install yourself, and CONTROL is the order to do it in. If you would rather buy the finished result, SPM The Construction CFO does this work for fencing contractors as a service. It is a separate firm, Sulphur Prairie Management, LLC, led by the same author.

What SPM The Construction CFO does, and what it costs

AUTHOR
Josh Luebker
JOSH LUEBKER
MASTER ELECTRICIAN · 150+ PROJECTS · $2.1B+ MANAGED

Wrote CONTROL, the 8 step system behind these figures. More about the author.

Updated

8 Steps 60 Days

CONTROL is the full system, written for commercial subcontractors from $1M to $100M. It's out now. 8 steps, 6 working templates, and the order they install in. $9.99 ebook, $24.99 paperback.