Fire protection contractors wait on the final test while a heavy slice of the contract sits unbilled behind inspection milestones. Pipe and heads get bought months early on long lead times, and design-build engineering rides in field rates that were never built to carry it. CONTROL restructures the billing, forecasts the buys, and prices the engineering.
The specific ways fire protection contractors lose cash, pulled straight from what makes this trade different.
Inspection and Test Billing Milestones
Hydro tests and final inspections gate the last chunk of billing behind schedules other people run. Milestone terms and dates keep that money from aging indefinitely.
Material Lead Time Cash Flow
Pipe, valves, and heads ordered on long lead times leave the account months before installation bills. Stored material applications put the float on the project.
Design-Build Overhead Allocation
NICET designers and engineering review are real overhead that design-build work creates. Field rates that ignore it lose money on every drawing.
The CONTROL chapters that solve this for fire protection contractors specifically.