You bid one trip and the inspector made it seven
You bid one mobilization and the job pulled six: survey, panel upgrade, racking and set, inspection, meter swap, and commissioning. Then a label correction sent you back again.
Most trades mobilize once or twice and stay until the scope is done. Solar returns four to six separate times by design, with three different agencies and a utility each able to send you back for a defect the crew can't see from the roof. A wrong placard costs the same truck roll as a failed array, and neither one is billable.
The size of it
Mobilization runs 20 to 35 percent of residential labor and almost everybody bids it once. Two re-inspection trips at $400 to $700 fully loaded will wipe out the margin on a 7 kW install completely.
Solar is the last trade on the roof and the only one that keeps coming back. The array can't go up until the roof is complete and warranted and the electrical room is energized, so every upstream delay compresses your work into whatever calendar is left. Penetrations through a warranted roof generally have to be made by the roofing contractor or a certified applicator or the warranty voids, and after that any leak becomes your problem no matter who caused it. A single residential job pulls discrete trips for site survey, main panel upgrade, racking and step set, AHJ inspection, utility meter swap, and commissioning. Any correction the inspector writes, whether it's NEC 690.12 rapid shutdown labeling, conduit spacing, 705.12(B) busbar sizing, or placard wording, is a full extra trip on a job that only carried 16 to 20 crew-hours to start with.
Three moves, in order
Step 02: Equipment cost basis
A true internal rate per machine covering ownership, maintenance, fuel, and transport, charged to the projects that used it.
What else costs solar contractors money
The same mechanism in other trades
What solar owners ask
How many trips does a residential solar install really take?
You bid one mobilization and the job pulled six: survey, panel upgrade, racking and set, inspection, meter swap, and commissioning. Then a label correction sent you back again.
What does it cost?
Mobilization runs 20 to 35 percent of residential labor and almost everybody bids it once. Two re-inspection trips at $400 to $700 fully loaded will wipe out the margin on a 7 kW install completely.
What do I do first?
Count the trips in your estimate template out loud: survey, MPU, set, inspection, meter swap, and commissioning. Price each one, and stop burying them in a single labor number.
What are solar contractors supposed to be making?
Solar runs 22% gross margin, 15% overhead and 7% net profit before taxes at $1M–$5M. The all-trade average is 7%, so this trade sits right on it. The CFOS target is 10%.
Which part of the system fixes it?
The step is number 02, equipment cost basis. A true internal rate per machine covering ownership, maintenance, fuel, and transport, charged to the projects that used it. It comes from chapter 2 of CONTROL: The Construction Financial Operating System.