Tank and vessel

Tank and vessel sits 1st of 3 in specialty on net profit, and carries leaner overhead than the 48-trade average. Here is every figure, across all 7 revenue bands.

OVERHEAD AT $1M–$5M
15%
CFOS target 14%. Shares this figure with 13 other trades, and sits 1 points below the specialty average.
GROSS MARGIN AT $1M–$5M
23%
CFOS target 24.5%. Shares this figure with 6 other trades, and sits 0.7 points below the specialty average.
NET PROFIT AT $1M–$5M
8%
CFOS target 10.5%. Shares this figure with 12 other trades, and sits 0.3 points above the specialty average.
ACROSS EVERY BAND

Tank and vessel by revenue band

TANK AND VESSEL · SPM TRADE BENCHMARK REFERENCE
Metric$1M–$5M$5M–$10M$10M–$25M$25M–$50M$50M–$100M$100M–$500M$500M+CFOS target
Overhead15%14%13%12%11%10%9%14%
Gross margin23%24%25%27%28%30%32%24.5%
Net profit8%10%12%15%17%20%23%10.5%
SOURCES
  1. 2024 Construction Financial Benchmarker, Executive Summary, Construction Financial Management Association, 2024. The survey puts gross profit margin at 21.8%, SG&A at 11.8%, and net income before taxes at 6.3% across all respondents. The best-in-class top quartile reaches 11.9% net income before taxes. Those figures are the whole-population reading, so a single trade can sit well either side of them.
  2. 2025 Performance Benchmarks, Construction Companies, Jones Maresca and Company, 2025. This study reports specialty contractor gross margin between 15% and 25%. It puts net profit at 5% to 8% for a well managed company, and total indirect cost between 8% and 15%. The indirect cost band is the one worth reading twice, because it's the number most owners have never calculated for their own shop.
  3. SPM Trade Benchmark Reference, Sulphur Prairie Operations LLC, 2026. The reference holds 48 trades, and net profit in it is stated before taxes. It publishes here as 47 trade pages, because landscaping and irrigation share an identical benchmark profile and are one market, so they're presented together. Everything else carries its own row.

How these figures were built. Gross margin and overhead come from CFMA's 2024 and 2025 financial survey data, plus a January 2026 specialty trade study. Net profit comes from a 48 trade master dataset that covers 24 served trades and 24 adjacent trades. The reference holds 48 trades and the site publishes 47 pages, because landscaping and irrigation carry the same figures and are the same market. Where the survey and the master disagree on net profit, the master carries it. Benchmarks are reviewed against each new CFMA survey release and reconciled before publication.

WHAT GOES WRONG IN THIS TRADE

6 problems specific to tank and vessel

WHAT GOES WRONG HERE

You bid the tank in March, won it in July, and bought the plate in August against a mill quote that expired in April. The plate slipped six weeks and there's nothing else on that site your welders are allowed to touch. Four welders spent two weeks cutting and testing coupons, and none of that time had a job number behind it. The tank has been holding water for eighteen months, the city loves it, and the owner still has your retainage.

Each one below points at the item, the unit, the clock, or the party that makes it a tank and vessel problem, and it says which step fixes it.

HOW IT COMPARES

Tank and vessel against the other 47 trades

TANK AND VESSEL · RANK AND SPREAD AT $1M–$5M
MetricTank and vesselSpecialty averageAll 48 averageRank
Overhead15%16%15.1%17th of 48
Gross margin23%23.7%22.1%13th of 48
Net profit8%7.7%7%8th of 48
WHAT THE RANKING SAYS

Tank and vessel sheds 6 points of overhead between $1M–$5M and $500M+, against 6.3 for specialty as a group. Inside that group, Tank and vessel keeps the most at 8% and Marine runs the leanest overhead at 15%. That's this trade.

QUESTIONS

What owners ask

What overhead should a tank and vessel contractor run?

Tank and vessel shares its overhead figure with 13 other trades at this revenue, which is what the published data resolves to. It runs 15% at $1M–$5M and 9% at $500M+, as a percentage of revenue. That sits 1 point below the specialty average of 16%. The CFOS target at $1M–$5M is 14%. The CFOS target is one point leaner than your trade's average at your revenue.

What gross margin should a tank and vessel contractor run?

Tank and vessel shares its gross margin figure with 6 other trades at this revenue, which is what the published data resolves to. It runs 23% at $1M–$5M and 32% at $500M+, as a percentage of revenue. That sits 0.7 points below the specialty average of 23.7%. The CFOS target at $1M–$5M is 24.5%. The CFOS target is published at $1M to $5M. It's set at whatever gross margin produces the net profit target once overhead is paid, and never below your trade's own average.

What net profit should a tank and vessel contractor run?

Tank and vessel shares its net profit figure with 12 other trades at this revenue, which is what the published data resolves to. It runs 8% at $1M–$5M and 23% at $500M+, before taxes, as a percentage of revenue. That sits 0.3 points above the specialty average of 7.7%. The CFOS target at $1M–$5M is 10.5%. The CFOS target is published at $1M to $5M.

Does tank and vessel get more profitable as it grows?

Overhead is the number that moves. Tank and vessel sheds 6 points between $1M–$5M and $500M+, which is in line with the 6.3 points specialty sheds as a group. Net profit is already above the 48-trade average, so the room is in holding it while revenue climbs.

Where does tank and vessel sit against the other trades?

Tank and vessel is 1st of 3 in specialty on net profit. It keeps the most in the group. Marine runs the leanest overhead at 15%. Gross margin ranks 17th of 48 and overhead ranks 8th.

AUTHOR
Josh Luebker
JOSH LUEBKER
MASTER ELECTRICIAN · 150+ PROJECTS · $2.1B+ MANAGED

Josh Luebker ran commercial construction projects before he ran the numbers behind them, on data centres, military bases, hospitals, and high-rises. He wrote CONTROL: The Construction Financial Operating System, which is an eight-step framework for commercial subcontractors, and it publishes on October 1, 2026. He is a master electrician who moved into the office and kept the field vocabulary.

Sulphur Prairie Operations LLC maintains the benchmark reference behind these figures. Every edition is reconciled against the newest CFMA survey release before it publishes here. Where a figure changes between editions, the older edition keeps its year in the title so a citation to it stays correct.