Price letters move faster than your contract
Shingles and polyiso reprice on 30 days notice. Your hard bid subcontract has no escalation language and the carrier's price list updates when the carrier feels like it.
A trade where material is a third of the job can absorb a feedstock move inside its labor productivity. Roofing can't. Half the contract value is a petrochemical commodity somebody else prices on a letter. Roofing is also the one trade that routinely signs a number at a storm and installs it months later, against a price list it has no say in.
The size of it
A 6% to 8% material increase on a job that's half material takes 3 to 4 points of gross margin straight off. That's most of the profit on a typical roofing job. On insurance work the supplement takes 30 to 90 days and often comes back partly denied.
Shingles, mod bit, and polyiso all track crude and MDI feedstock. Manufacturers push increases as announced percentage letters with roughly 30 days notice, sometimes more than once a year. Material is 40% to 55% of a commercial single ply re-roof and higher on seamed metal roofs. So your exposure per dollar of contract is far larger than in trades where material is a third of the job. Escalation gets refused from two directions. Hard bid commercial subcontracts don't include the language. Residential restoration is priced off a carrier's estimating price list that moves on its own schedule. On storm work the contract gets signed at the hail event and installed a season later. Your only way to recover on that work is a supplement, and an adjuster decides whether it gets approved.
Three moves, in order
Step 04: Estimating system
The estimate maps one to one onto the job cost codes, so variance means something the day it appears.
What else costs roofing contractors money
The same mechanism in other trades
What roofing owners ask
How do roofers handle material price increases after the contract is signed?
Shingles and polyiso reprice on 30 days notice. Your hard bid subcontract has no escalation language and the carrier's price list updates when the carrier feels like it.
What does it cost?
A 6% to 8% material increase on a job that's half material takes 3 to 4 points of gross margin straight off. That's most of the profit on a typical roofing job. On insurance work the supplement takes 30 to 90 days and often comes back partly denied.
What do I do first?
Ask each distributor branch for its current announced increase letters and put the effective dates on the same calendar as your backlog start dates.
What are roofing contractors supposed to be making?
Roofing has 22% gross margin, 15% overhead and 7% net profit before taxes at $1M to $5M. The all-trade average is 7%, so this trade is right on it. The CFOS target is 10.5%.
Which part of the system fixes it?
The step is number 04, estimating system. The estimate maps one to one onto the job cost codes, so variance means something the day it appears. It comes from chapter 4 of CONTROL: C.F.O.S. Construction Financial Operating System.
Everything on this page is something you can install yourself, and CONTROL is the order to do it in. If you would rather buy the finished result, SPM The Construction CFO does this work for roofing contractors as a service. It is a separate firm, Sulphur Prairie Management, LLC, led by the same author.