Remediation
Remediation sits 4th of 11 in civil and earthwork on net profit, and carries heavier overhead than the 48-trade average. Here is every figure, across all 7 revenue bands.
Remediation by revenue band
| Metric | $1M–$5M | $5M–$10M | $10M–$25M | $25M–$50M | $50M–$100M | $100M–$500M | $500M+ | CFOS target |
|---|---|---|---|---|---|---|---|---|
| Overhead | 16% | 15% | 14% | 13% | 12% | 11% | 10% | 15% |
| Gross margin | 23% | 24% | 26% | 27% | 28% | 30% | 31% | 25% |
| Net profit | 7% | 9% | 12% | 14% | 16% | 19% | 21% | 10% |
- 2024 Construction Financial Benchmarker, Executive Summary, Construction Financial Management Association, 2024. The survey puts gross profit margin at 21.8%, SG&A at 11.8%, and net income before taxes at 6.3% across all respondents. The best-in-class top quartile reaches 11.9% net income before taxes. Those figures are the whole-population reading, so a single trade can sit well either side of them.
- 2025 Performance Benchmarks, Construction Companies, Jones Maresca and Company, 2025. This study reports specialty contractor gross margin between 15% and 25%. It puts net profit at 5% to 8% for a well managed company, and total indirect cost between 8% and 15%. The indirect cost band is the one worth reading twice, because it's the number most owners have never calculated for their own shop.
- SPM Trade Benchmark Reference, Sulphur Prairie Operations LLC, 2026. The reference holds 48 trades, and net profit in it is stated before taxes. It publishes here as 47 trade pages, because landscaping and irrigation share an identical benchmark profile and are one market, so they're presented together. Everything else carries its own row.
How these figures were built. Gross margin and overhead come from CFMA's 2024 and 2025 financial survey data, plus a January 2026 specialty trade study. Net profit comes from a 48 trade master dataset that covers 24 served trades and 24 adjacent trades. The reference holds 48 trades and the site publishes 47 pages, because landscaping and irrigation carry the same figures and are the same market. Where the survey and the master disagree on net profit, the master carries it. Benchmarks are reviewed against each new CFMA survey release and reconciled before publication.
6 problems specific to remediation
You mobilized, the excavation is open, and the only permitted facility that will take the material is 400 miles away and booked three weeks out. The cut is finished, the sidewalls are trimmed, and your crew and your machines sit there while a lab decides whether you're allowed to backfill. You priced the dirt as non-hazardous off borings somebody else drilled, and the TCLP came back failing for lead. The soil left in the spring, the crew has been on three other jobs since, and your final draw is sitting behind a state agency's review.
Each one below points at the item, the unit, the clock, or the party that makes it a remediation problem, and it says which step fixes it.
Remediation against the other 47 trades
| Metric | Remediation | Civil and earthwork average | All 48 average | Rank |
|---|---|---|---|---|
| Overhead | 16% | 15% | 15.1% | 31st of 48 |
| Gross margin | 23% | 20.7% | 22.1% | 13th of 48 |
| Net profit | 7% | 5.7% | 7% | 21st of 48 |
Remediation sheds 6 points of overhead between $1M–$5M and $500M+, against 6.2 for civil and earthwork as a group. Inside that group, SWPPP and erosion control keeps the most at 10% and Civil runs the leanest overhead at 14%. Remediation is neither, which is the usual position and the one with the most room in it.
Other civil and earthwork trades
What owners ask
What overhead should a remediation contractor run?
Remediation shares its overhead figure with 12 other trades at this revenue, which is what the published data resolves to. It runs 16% at $1M–$5M and 10% at $500M+, as a percentage of revenue. That sits 1 point above the civil and earthwork average of 15%. The CFOS target at $1M–$5M is 15%. The CFOS target is one point leaner than your trade's average at your revenue.
What gross margin should a remediation contractor run?
Remediation shares its gross margin figure with 6 other trades at this revenue, which is what the published data resolves to. It runs 23% at $1M–$5M and 31% at $500M+, as a percentage of revenue. That sits 2.3 points above the civil and earthwork average of 20.7%. The CFOS target at $1M–$5M is 25%. The CFOS target is published at $1M to $5M. It's set at whatever gross margin produces the net profit target once overhead is paid, and never below your trade's own average.
What net profit should a remediation contractor run?
Remediation shares its net profit figure with 15 other trades at this revenue, which is what the published data resolves to. It runs 7% at $1M–$5M and 21% at $500M+, before taxes, as a percentage of revenue. That sits 1.3 points above the civil and earthwork average of 5.7%. The CFOS target at $1M–$5M is 10%. The CFOS target is published at $1M to $5M.
Does remediation get more profitable as it grows?
Overhead is the number that moves. Remediation sheds 6 points between $1M–$5M and $500M+, which is in line with the 6.2 points civil and earthwork sheds as a group. Net profit is already above the 48-trade average, so the room is in holding it while revenue climbs.
Where does remediation sit against the other trades?
Remediation is 4th of 11 in civil and earthwork on net profit. SWPPP and erosion control keeps the most at 10%. Civil runs the leanest overhead at 14%. Gross margin ranks 31st of 48 and overhead ranks 21st.
